My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 4:06:19 PM
Creation date
3/5/2026 4:06:12 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-49
Res Ord Title
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
Department
Public Works
Approved Date
3/2/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1 <br /> CITY OF DECATUR - PUBLIC WORKS DEPARTMENT <br /> SANITARY SEWER SYSTEM REHABILITATION FOR <br /> LOST BRIDGE NORTH (TA_3N) & FLORIAN (TA_6) BASINS <br /> SCOPE OF DESIGN PHASE SERVICES <br /> • Repairing tap break-ins <br /> • Repairing defective or broken taps <br /> • Removing bends and repairing laterals to facilitate lateral lining <br /> • Rehabilitate 100% of laterals <br /> Manhole Work Includes: <br /> • Removing and replacing frames and lids <br /> • Removing and resetting frames and chimney risers <br /> • Rehabilitate and replace failing manholes <br /> • Raise select manhole frames and lids <br /> • Install manhole liner <br /> PROFESSIONAL ENGINEERING DESIGN PHASE SERVICES <br /> The following tasks will be performed to prepare the aforementioned deliverables for <br /> both basins. COD agrees to provide recent (within one year) sewer main inspection <br /> data to the engineer. <br /> Task 1: Sewer Main and Manhole Repair and Replacement <br /> 1. Review details of prior inspection reports, sewer alignments and manhole <br /> locations with City staff to determine desired approach and preferred products. <br /> 2. Perform detailed topographic field surveys of the sewer segments planned to be <br /> replaced. <br /> 3. Generate topographic mapping of the sewer alignments. <br /> 4. Prepare sewer replacement plan and profiles. <br /> 5. Prepare legal descriptions for temporary construction easements associated with <br /> the proposed sewer replacements (5 estimated). <br /> 6. Finalize the sewer plan and profile(s) upon obtaining feedback from City staff. <br /> 7. Finalize design plans and details to support the bidding documents. <br /> 8. Prepare technical specifications. <br /> 9. Calculate plan quantities and prepare opinions of probable construction cost to <br /> compare to the project budgets. <br /> Task 2: Cured-in-Place-Pipe and Cured-in-Place-Manhole Liner <br /> 1. Review specific sewer main, manhole and sewer lateral rehabilitation options and <br /> vendors with City staff to determine desired repair and rehabilitation approaches. <br /> 2. Perform preliminary design necessary for CIPP and CIPM . <br /> 24006892.01 A-1-4 02/19/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.