My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 4:06:19 PM
Creation date
3/5/2026 4:06:12 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-49
Res Ord Title
R2026-49 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Final Design Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration Reduction
Department
Public Works
Approved Date
3/2/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1 <br /> CITY OF DECATUR - PUBLIC WORKS DEPARTMENT <br /> SANITARY SEWER SYSTEM REHABILITATION FOR <br /> LOST BRIDGE NORTH (TA_3N) & FLORIAN (TA_6) BASINS <br /> SCOPE OF DESIGN PHASE SERVICES <br /> Sewer Main Work Includes: <br /> • Cutting and treating roots <br /> • Sewer cleaning <br /> • Correcting offset joints <br /> • Point repairs and sewer removal and replacement <br /> • Cured-in-place-pipe (CIPP) lining <br /> Sewer Lateral Work Includes: <br /> • Repairing tap break-ins <br /> • Repairing defective or broken taps <br /> • Removing bends and repairing laterals to facilitate lateral lining <br /> • Rehabilitate 90% of laterals <br /> Manhole Work Includes: <br /> • Removing and replacing frames and lids <br /> • Removing and resetting frames and chimney risers <br /> • Rehabilitate and replace failing manholes <br /> • Raise select manhole frames and lids <br /> • Installing exterior drop connections <br /> FLORIAN — TA 6 <br /> For Florian, the preferred alternative is 2A (5-year level of protection), which includes all <br /> the work described below. Success of Alternative 2A is predicated on the removal of all <br /> known connected sump pumps. <br /> Sewer Main Work Includes: <br /> • Cutting and treating roots <br /> • Sewer cleaning <br /> • Correcting offset joints <br /> • Point repairs and sewer removal and replacement <br /> • Cured-in-place-pipe (CIPP) lining <br /> Sewer Lateral Work Includes: <br /> 24006892.01 A-1-3 02/19/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.