EXHIBIT A-1 <br /> CITY OF DECATUR - PUBLIC WORKS DEPARTMENT <br /> SANITARY SEWER SYSTEM REHABILITATION FOR <br /> LOST BRIDGE NORTH (TA_3N) & FLORIAN (TA_6) BASINS <br /> SCOPE OF DESIGN PHASE SERVICES <br /> • March 2026: approval of this engineering agreement and a notice to proceed <br /> issued to CMT. <br /> • March 2026: submit an updated Funding Nomination Form (FNF) to IFAS. <br /> • October 2026: submit an updated PP with environmental signoffs to IFAS, if <br /> needed based on design and permitting conditions. <br /> • March 2027: submit an updated FNF and loan application to IFAS. <br /> It is believed that maintaining the aforementioned schedule of submittals to IFAS will <br /> likely result in the COD being listed on the IFL published on or around June 30, 2027, <br /> but there are no guarantees. If this COD project is listed on the IFL, work is anticipated <br /> to be advertised for bids in October of 2027. Having bids in hand and a <br /> recommendation to award a contract prior to the end of 2027 potentially means <br /> construction could start in the spring of 2028 and conclude by the end of 2029. <br /> With the preferred alternative for each basin determined, the planning level information <br /> will be transformed into actionable items in the form of construction plans, technical <br /> specifications, bidding and contracting documents and opinions of cost so this work can <br /> be publicly advertised and bid. Deliverables for Lost Bridge North and Florian sewer <br /> system rehabilitation include the following: <br /> 1. Construction plans, specifications and bidding documents suitable for public <br /> bidding of the sewer system rehabilitation and in accordance with COD and IFAS <br /> rules and requirements. <br /> 2. Engineer's Opinions of Probable Construction Cost. <br /> 3. Legal descriptions and plats for inclusion in easement documents, where <br /> needed. <br /> Following are details from the SSAA report and engineering tasks to prepare the <br /> deliverables. This scope of services includes field work to prepare design plans, <br /> rehabilitation design, permitting, reviews and bidding. Contracting and construction <br /> phase services are not included. This scope of services assumes the COD has <br /> easements for sewer mains and manholes that are not in the public right-of-way. <br /> LOST BRIDGE NORTH (LBN) — TA 3N <br /> For LBN, the preferred alternative is 2A (5-year level of protection), which generally <br /> includes all the work described below. Success of Alternative 2A is predicated on the <br /> removal of all known connected sump pumps. <br /> 24006892.01 A-1-2 02/19/2026 <br />