My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-58 Resolution Authorizing Lake Decatur Watershed Farmland Conservation Program Agreement for Floodplain Reconnection Wetlands with Lawrence H. Shackelford Trust
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-58 Resolution Authorizing Lake Decatur Watershed Farmland Conservation Program Agreement for Floodplain Reconnection Wetlands with Lawrence H. Shackelford Trust
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2026 1:21:31 PM
Creation date
3/19/2026 1:21:28 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-58
Res Ord Title
R2026-58 Resolution Authorizing Lake Decatur Watershed Farmland Conservation Program Agreement for Floodplain Reconnection Wetlands with Lawrence H. Shackelford Trust
Department
Public Works
Approved Date
3/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Council Memo <br /> Public Works Department <br /> No. 2026-33 <br /> DATE: 3/16/2026 <br /> TO: Honorable Mayor Julie Moore Wolfe and City Council Members <br /> FROM: Melissa Hon,City Manager <br /> Matt Newell,Director of Public Works <br /> Robert Weil,Water Production Manager <br /> Jennifer Gunter,Watershed & Lake Manager <br /> SUBJECT: <br /> Resolution Authorizing Lake Decatur Watershed Farmland Conservation Program Agreement for <br /> Floodplain Reconnection Wetlands with Lawrence H. Shackelford Trust <br /> SUMMARY RECOMMENDATION: It is recommended that the City Council approve the attached <br /> resolution authorizing a Lake Decatur Watershed Farmland Conservation Program Agreement between the City <br /> of Decatur and Lawrence H. Shackelford Trust for the construction of a floodplain reconnection wetland project <br /> to control sediment and nutrients at a cost not to exceed$131,400.00. <br /> BACKGROUND: <br /> The City's 2021 Watershed Management Plan is designed to significantly reduce Lake Decatur sedimentation <br /> and improve the lake's water quality through watershed conservation. <br /> A floodplain reconnection wetland project is to be constructed on private land and will consist of 1.45 acres of <br /> wetlands and 1,500 linear feet of stream bed stabilization. This project is expected to result in these reductions <br /> over the 15-year life of the project: <br /> Nitrogen 40,260 pounds <br /> Phosphorus 7,380 pounds <br /> Sediment 6,123 tons <br /> This particular project is directly adjacent to Lake Decatur, and so it has a direct reduction in pollution entering <br /> the City's water supply. This project is different than the typical watershed protection program project in that <br /> the landowner will not experience much benefit from it; they are basically performing the project on the City's <br /> behalf as a good steward of their land. The main feature to be installed is a well-supported conservation practice <br /> called"floodplain reconnection wetlands,"which allows a stream running through the property to safely <br /> overflow without causing erosion. At the same time the stream bed and banks will be stabilized. The details of <br /> the project are attached to Exhibit A of the Resolution. <br /> Because the benefits are almost all to Lake Decatur and not to the farmer,the city cost share for this particular <br /> project has been set at 100%rather than the typical 90%cost share. However, the City share will be offset by a <br /> Section 319 grant, as outlined below. <br /> SCHEDULE: <br /> Work on this project is expected to start in April 2026 and will be completed by May 2026 depending on <br />
The URL can be used to link to this page
Your browser does not support the video tag.