My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-74 Resolution to Approve an Engineering Services Agreement with WHKS and Co. and Appropriate Motor Fuel Tax Funds for the Garfield Avenue Bridge over the Illinois Central Railroad, SN 058-6000, City Project 2026-24
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-74 Resolution to Approve an Engineering Services Agreement with WHKS and Co. and Appropriate Motor Fuel Tax Funds for the Garfield Avenue Bridge over the Illinois Central Railroad, SN 058-6000, City Project 2026-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2026 8:26:39 AM
Creation date
4/24/2026 2:48:31 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-74
Res Ord Title
R2026-74 Resolution to Approve an Engineering Services Agreement with WHKS and Co. and Appropriate Motor Fuel Tax Funds for the Garfield Avenue Bridge over the Illinois Central Railroad, SN 058-6000, City Project 2026-24
Department
Public Works
Approved Date
4/6/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Public Agency Prime Consultant(Firm)Name County Section Number <br /> City of Decatur IIWHKS & Co IlMacon 26-00624-00-BR <br /> EXHIBIT A <br /> SCOPE OF SERVICES <br /> To perform or be responsible for the performance of the engineering services for the LPA, in connection with the PROJECT herein before <br /> described and enumerated below <br /> ,A. Project Description: <br /> This project involves performing the 2026 NBIS Routine (In-Depth) & Special inspections and preparation of the ' <br /> (Bridge Condition Report (BCR) for Structure Number 058-6000 under the jurisdiction of the Client: <br /> BCR will include clear, practical recommendations consistent with BLRS planning expectations, including: <br /> • Short-term maintenance and repair actions <br /> • Intermediate rehabilitation measures <br /> • Long-term rehabilitation or replacement considerations <br /> • Prioritization of recommended actions <br /> • Identification of potential project development paths (maintenance vs. improvement vs. replacement) <br /> Field inspection hours and expenses are based on 2 trips over 2 working days to complete both the Routine (In- <br /> Depth), Special, and BCR inspections. Additional hours and expenses required due to unforeseen circumstances. <br /> ,will be negotiated with Client for approval of fee prior to completion of work. <br /> WHKS will request the use of an IDOT owned under-bridge inspection truck to aid in inspection. If IDOT will not <br /> provide use of their under-bridge inspection truck, WHKS will contract with an equipment supplier which will be <br /> ;direct billed to the Client. <br /> The Client will coordinate and provide traffic control for both days of inspection and will provide a bucket truck for <br /> !accessing end spans. <br /> It is assumed abutments are sand-filled and confined space entry of vaulted abutments is not required. <br /> The work will be done in accordance with "Structural Services Manual", dated 2025, by the IDOT (Illinois <br /> Department of Transportation), the 3rd Edition of the "Manual for Bridge Evaluation" by AASHTO (American <br /> Association of State Highway Transportation Officials), the current "Specifications for Illinois Bridge <br /> Inventory" (SIBI) by IDOT, and. all current NBI (National Bridge Inspection) Subscription Service <br /> Announcements by IDOT. <br /> B. Scope of Services Provided Under This Agreement: <br /> 1. Project Management and Meetings <br /> l• Perform general project administrative duties including supervision and coordination of the project team, review <br /> of project costs, and prepare invoices using Consultant's standard forms. <br /> • Advise the Client of the necessity of obtaining Special Engineering Services as described in Paragraph C.. and <br /> act as the Client's representative in connection with any such services not performed by WHKS. <br /> • Attend one (1) virtual meeting to discuss the Bridge Condition Report and recommendations. <br /> 2. Project Coordination and Data Review <br /> • Coordinate with the Client and IDOT BLRS as required. <br /> i• Obtain, review, and summarize available background information, including: <br /> o Previous bridge inspection reports and condition reports <br /> o As-built and record plans <br /> o Load ratings and posting history <br /> o Maintenance and repair records <br /> Page 1 of 13 BLR 05530(Rev 10/24/25) <br />
The URL can be used to link to this page
Your browser does not support the video tag.