My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-349 Resolution Authorizing a Behind the Meter Solar Project for the William Street Pump Station (2)
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-349 Resolution Authorizing a Behind the Meter Solar Project for the William Street Pump Station (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 8:34:28 AM
Creation date
5/6/2026 8:34:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-349
Res Ord Title
R2024-349 Resolution Authorizing a Behind the Meter Solar Project for the William Street Pump Station
Department
Public Works
Approved Date
11/18/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POWER PURCHASE AGREEMENT ("PPA") <br /> Exhibit 8 <br /> Project Requirements <br /> 7. Project Requirements <br /> 7.1. Electrical Service and Interconnection Requirements <br /> 7.1.1.The CONTRACTOR shall provide a layout of the solar system and identify the location of the <br /> interconnection to the utility and the host COD metered account. <br /> 7.1.2.The CONTRACTOR shall interconnect the solar system with the existing building service and this <br /> service shall be independent of the other services required by the facility. <br /> 7.1.3.The contractor is to determine the main service amperage for each account to be associated with <br /> the solar system. <br /> 7.1.4 The solar system shall be a Net Meter interconnection with Ameren Illinois in accordance with the <br /> current Distributed Generation Interconnection Administration Code. <br /> 7.1.5.The existing meter shall be replaced by Ameren, Illinois to provide a two-way meter capable of <br /> measuring the flow of electricity in two directions. <br /> 7.1.6. Due to the location of the service interconnections, a separate solar system disconnect panel shall <br /> be located near the main entrance for use by fire and emergency services with access to be approved by <br /> Authority Having Jurisdiction (AHJ). <br /> 7.2. Design Requirements <br /> 7.2.1.The CONTRACTOR shall commence the design of the solar system with the preparation of"design <br /> development"contract documents to include but not be limited to outline specifications,detailed <br /> implementation/construction plans, and detailed permit/regulatory submission plans to be submitted <br /> for COD review and comment. <br /> 7.2.2.The CONTRACTOR shall include 35%design drawings on the solar grid support structure,solar <br /> array layout, electrical equipment, and electrical interconnection/metering. <br /> 7.2.3.The CONTRACTOR shall include specifications for the solar panels, inverters, electrical equipment, <br /> electrical interconnection/metering,system controls and monitoring equipment. <br /> 7.2.4.The CONTRACTOR shall include specifications for the solar grid support with design drawings, <br /> design calculations, and design load calculation based on the existing building structure capacity to <br /> support the new load for the solar system. <br /> 7.2.5.The CONTRACTOR shall provide relevant technical documentation of the technologies proposed to <br /> be installed for the solar system. <br /> 7.2.6.The CONTRACTOR shall provide a PVSYST model run for the system size being proposed which <br /> supports the data included in the Proposal to include but not limited to: <br /> • Maximum Guaranteed power capacity(DC kW), measured at the inverter(s) input. <br /> • Guaranteed power capacity(AC kW), measured at the inverter(s)output. <br /> Page 42 of 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.