R2024-349 Resolution Authorizing a Behind the Meter Solar Project for the William Street Pump Station (2)
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-349 Resolution Authorizing a Behind the Meter Solar Project for the William Street Pump Station (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 8:34:28 AM
Creation date
5/6/2026 8:34:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-349
Res Ord Title
R2024-349 Resolution Authorizing a Behind the Meter Solar Project for the William Street Pump Station
Department
Public Works
Approved Date
11/18/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POWER PURCHASE AGREEMENT ("PPA") <br /> • Nominal and de-rated AC kW production, including data assumptions for winter and summer hours of <br /> solar generation. <br /> • Summer on-peak, mid-peak, and winter peak hours must be explained with some detail of <br /> assumptions and performance criteria based on seasonal sunlight availability and variable weather <br /> conditions. <br /> • Estimated capacity factor(percent) and annual output (kWh), and provide the methodology used to <br /> develop the estimates. <br /> • Guaranteed maximum PV panel degradation rate over a fifteen-year period. <br /> 7.2.7.The CONTRACTOR shall develop and submit with the Design Development Documents a detailed <br /> permit/regulatory submission plan for COD for review and comment. <br /> 7.2.8.The CONTRACTOR shall develop and submit with the Design Development Documents the Ameren <br /> Illinois utility interconnection and related permit applications submission plan to COD for review and <br /> comment. <br /> 7.2.9. Further design and submission of applications for permits and regulatory approvals shall not <br /> commence until the "design development" contract documents are approved by the COD. <br /> 7.2.10.The CONTRACTOR shall provide services to install Fire Department Emergency Disconnection <br /> System at the main service disconnection for the City of Decatur Fire Rescue response personnel.The <br /> disconnection shall allow emergency personnel secure access to the disconnection panel.The National <br /> Electric Code (NEC) requires a "rapid shut down system"to insure full shut down of electricity <br /> production from the solar panels, inverters, and associated equipment.The CONTRACTOR shall include <br /> in the design development and final design documents details on the service disconnect location, panel, <br /> controls, and sequence of operation. <br /> 7.2.11. Upon the COD approval of the design development documents the CONTRACTOR shall develop <br /> and submit 95%design documents to include but not limited to solar grid support structure, solar array, <br /> electric equipment,electrical interconnection/metering equipment,and all related building <br /> components. <br /> 7.2.12.The CONTRACTOR shall include final specifications for the solar panels, inverters,electric <br /> equipment,electrical interconnection/metering,system controls and monitoring equipment.Submit <br /> with the 95%design documents the detailed permit/regulatory submission plan and Ameren Illinois <br /> interconnection and related permit applications submission plan for COD review and comment. <br /> 7.2.13. Upon approval from the COD the CONTRACTOR shall complete the 100%design documents for <br /> the complete system.The design documents shall be signed and sealed by the applicable design <br /> professionals to include, but is not limited to, structural engineer, electrical engineer,solar engineer, <br /> and if applicable, a registered architect and mechanical engineer.The completed documents are to be <br /> provided to the COD for their records. <br /> 7.3. Permit Requirements <br /> 7.3.1.The installation shall include, but is not limited to, securing all permits and approvals from <br /> governing agencies,Ameren, Illinois,and applicable regulatory authorities for all equipment necessary <br /> Page 43 of 49 <br />