POWER PURCHASE AGREEMENT ("PPA") <br /> • Nominal and de-rated AC kW production, including data assumptions for winter and summer hours of <br /> solar generation. <br /> • Summer on-peak, mid-peak, and winter peak hours must be explained with some detail of <br /> assumptions and performance criteria based on seasonal sunlight availability and variable weather <br /> conditions. <br /> • Estimated capacity factor(percent) and annual output (kWh), and provide the methodology used to <br /> develop the estimates. <br /> • Guaranteed maximum PV panel degradation rate over a fifteen-year period. <br /> 7.2.7.The CONTRACTOR shall develop and submit with the Design Development Documents a detailed <br /> permit/regulatory submission plan for COD for review and comment. <br /> 7.2.8.The CONTRACTOR shall develop and submit with the Design Development Documents the Ameren <br /> Illinois utility interconnection and related permit applications submission plan to COD for review and <br /> comment. <br /> 7.2.9. Further design and submission of applications for permits and regulatory approvals shall not <br /> commence until the "design development" contract documents are approved by the COD. <br /> 7.2.10.The CONTRACTOR shall provide services to install Fire Department Emergency Disconnection <br /> System at the main service disconnection for the City of Decatur Fire Rescue response personnel.The <br /> disconnection shall allow emergency personnel secure access to the disconnection panel.The National <br /> Electric Code (NEC) requires a "rapid shut down system"to insure full shut down of electricity <br /> production from the solar panels, inverters, and associated equipment.The CONTRACTOR shall include <br /> in the design development and final design documents details on the service disconnect location, panel, <br /> controls, and sequence of operation. <br /> 7.2.11. Upon the COD approval of the design development documents the CONTRACTOR shall develop <br /> and submit 95%design documents to include but not limited to solar grid support structure, solar array, <br /> electric equipment,electrical interconnection/metering equipment,and all related building <br /> components. <br /> 7.2.12.The CONTRACTOR shall include final specifications for the solar panels, inverters,electric <br /> equipment,electrical interconnection/metering,system controls and monitoring equipment.Submit <br /> with the 95%design documents the detailed permit/regulatory submission plan and Ameren Illinois <br /> interconnection and related permit applications submission plan for COD review and comment. <br /> 7.2.13. Upon approval from the COD the CONTRACTOR shall complete the 100%design documents for <br /> the complete system.The design documents shall be signed and sealed by the applicable design <br /> professionals to include, but is not limited to, structural engineer, electrical engineer,solar engineer, <br /> and if applicable, a registered architect and mechanical engineer.The completed documents are to be <br /> provided to the COD for their records. <br /> 7.3. Permit Requirements <br /> 7.3.1.The installation shall include, but is not limited to, securing all permits and approvals from <br /> governing agencies,Ameren, Illinois,and applicable regulatory authorities for all equipment necessary <br /> Page 43 of 49 <br />