Laserfiche WebLink
POWER PURCHASE AGREEMENT ("PPA") <br /> to construct a fully operational solar photovoltaic electric generating system. <br /> 7.3.2.The CONTRACTOR shall develop a detailed permit/regulatory submission plan for COD review and <br /> comment. <br /> 7.3.3.The submission of the permit applications shall be coordinated and submitted with the prior <br /> approval of the COD. <br /> 7.3.4. If approval for utility interconnection is not obtained,the PPA can be terminated by the COD with <br /> no cost or payment due to the CONTRACTOR. <br /> 7.3.5. If approval is not obtained from any applicable regulatory or approval agency to include but not <br /> be limited to building permits, environmental permits,storm water management permits, fire <br /> department approval, electrical inspections, etc.the PPA can be terminated by the COD with no cost or <br /> payment due to the CONTRACTOR. <br /> 7.4. Construction Requirements <br /> 7.4.1.CONTRACTOR shall provide a detailed construction schedule and submit to the COD for review, <br /> comments,and revisions prior to commencement of construction.The schedule must accommodate the <br /> ongoing event activities at the City of Decatur Firehouse#2 so as not to restrict parking and access to <br /> the facilities.The plan should have not more than 25%of the current parking lot set aside for <br /> construction at the same time as the facility is under construction.A phased plan must be proposed to <br /> ensure continuity of services and access to events by the general public and COD staff. <br /> 7.4.2.CONTRACTOR must have the designated Project Manager/Supervisor/Foreman on site at all times <br /> when construction is underway. <br /> 7.4.3. CONTRACTOR shall propose an area for material delivery and storage&submit to the COD for <br /> review, comments,and revisions prior to commencement of construction.The area must be enclosed <br /> with a temporary fence or approved enclosure. COD is not responsible or liable for materials stored <br /> onsite by the CONTRACTOR. <br /> 7.4.4.CONTRACTOR shall avoid activities creating a significant noise during regular operating/working <br /> hours. No temporary interruption of electric power in the buildings, either partially or for the entire <br /> service, is to be performed during regular operating/working hours.All service interruptions shall be <br /> performed with prior approval by the COD after regular operating/working hours. <br /> 7.4.5.The CONTRACTOR shall provide all labor, materials, equipment, supplies,construction equipment <br /> to include cranes,scaffolding, etc. and related services to construct the solar photovoltaic generating <br /> systems as requested in this RFP to include but not limited to the following: <br /> 1. Solar panels&array <br /> 2. Inverters and Components <br /> 3.Structural grid support system <br /> 4. Electric equipment and all related equipment <br /> 5. Electrical interconnection/metering equipment <br /> Page 44 of 49 <br />