Council Memo <br /> Public Works Department <br /> No. 2026-53 <br /> DATE: 6/1/2026 <br /> TO: Honorable Mayor Julie Moore Wolfe and City Council Members <br /> FROM: Melissa Hon, City Manager <br /> Matt Newell,Director of Public Works <br /> Robert Weil, Water Production Manager <br /> John Dodwell,Water Production Maintenance Supervisor <br /> SUBJECT: <br /> Resolution Authorizing a Professional Services Agreement with Paul's Machine and Welding Corp., to <br /> Provide Engineering, Labor and Material to Rebuild the Sluice Gate Hoist Machinery Frame for the <br /> Lake Decatur Dam South Sluice Gate <br /> SUMMARY RECOMMENDATION: It is recommended that the City Council approve the resolution <br /> authorizing a professional services agreement with Paul's Machine and Welding Corp. in the amount of <br /> $107,930,to provide engineering, labor and material to rebuild the hoist machinery frame for the Lake Decatur <br /> Dam south sluice gate. <br /> BACKGROUND: <br /> The sluice gates are the vertical gates located on the north end of the dam structure. They are generally the only <br /> way to release water from the dam during the winter months. They are raised or lowered by means of a <br /> mechanical gear system. An unusual incident occurred during the extremely cold conditions on January 16, <br /> 2024. The sluice gates needed to be raised to release water from a precipitation event. However,when the <br /> attempt was made to operate the sluice gates,the hoist machinery for both north and south sluice gates were <br /> damaged. <br /> Following that incident, Water Production staff approached area machine shops and only one was willing to <br /> propose on the necessary repairs. Paul's Machine and Welding, located in Villa Grove, Illinois,performed a <br /> complete design and rebuild of the drive frame for the north sluice gate hoist machinery. Their work product <br /> was such that Public Works would prefer them to complete the south gate hoist mechanism repairs. Paul's is a <br /> large firm involved in fabrication, industrial millwright services, material management, as well as product <br /> development. The replacement project that Paul's completed on the north gate was engineered well and should <br /> last another 50 years. At the time,the south gate frame was welded to restore it to operation. <br /> Their proposal to replace the hoist mechanism frame for the south gate outlines a workmanlike approach to <br /> replace the support frames that were fractured and welded back together following the 2024 icing event. The <br /> cost proposal is for an amount of$97,930, which includes payment of prevailing wages for those involved in <br /> the on-site removal and reinstallation. An additional allowance of$10,000 is included in the contract to provide <br /> for unforeseen contingencies that may arise, for a total contract price of$107,930. <br /> LEGAL REVIEW: The form of agreement was previously approved by legal counsel for the repairs <br /> completed in 2024. <br />