Laserfiche WebLink
BURNS .. McDONNELL- <br /> June 5, 2026 EXHIBIT A <br /> Robert Weil, PE, MSCE, MEd <br /> Water Production General Manager <br /> 1155 S Martin Luther King Jr. Drive <br /> Decatur, IL 62521 <br /> RE: Proposal for Engineering Services <br /> South Water Treatment Plant Expansion Plan <br /> Dear Mr. Weil: <br /> Burns & McDonnell Engineering Co., Inc. (BMcD)has prepared a Scope of Services (Scope) <br /> per your request for engineering services for the South Water Treatment Plant(SWTP) <br /> Expansion for the City of Decatur(City). <br /> BACKGROUND <br /> The City is experiencing a period of significant industrial growth,positioning it as a key <br /> economic hub in the region. This growth is projected to place substantial new demands on the <br /> City's drinking water infrastructure. The SWTP currently has a nameplate capacity of 36.0 MGD <br /> and operates with a reserve capacity that will be reduced once the new industrial demand comes <br /> online. In response,the City issued a Request for Qualifications and Proposals for this SWTP <br /> Expansion plan project(Expansion Plan). The purpose of this Expansion Plan is to perform data <br /> collection, analysis, and preliminary, conceptual engineering for future capital projects to be <br /> incorporated into the City's overall Capital Improvements Plan(CIP).The findings and <br /> conceptual designs will be summarized in a preliminary design report, which is the primary <br /> deliverable to be prepared under this Scope. Some of the capital projects will require an <br /> evaluation of multiple alternatives, which will be included in the preliminary design report.After <br /> the City selects the desired alternative, a final conceptual design of the selected alternative will <br /> be prepared as part of a subsequent authorization of services. The Expansion Plan will include an <br /> estimate of the maximum allowable buildout capacity of the SWTP and address several key areas <br /> critical to the SWTP's long-term reliability and resilience, including: <br /> • Capacity and Treatment Enhancements: Evaluating alternatives to increase treatment <br /> capacity and improve the performance of core processes like clarification, filtration, and <br /> storage. <br /> • Regulatory Compliance: Addressing ongoing challenges with Disinfection Byproducts <br /> (DBPs) and preparing for the treatment of potential emerging contaminants. <br /> • Security and Resilience: Incorporating physical and cybersecurity improvements as <br /> highlighted in the City's 2025 Risk and Resilience Assessment(RRA). <br /> This Expansion Plan is a continuation of planning efforts undertaken by the City. Several of the <br /> evaluations included in this scope, particularly those related to disinfection, storage, and filter <br /> media,will build upon the findings and data from the ongoing Disinfection Byproduct Reduction <br /> Study report drafted by BMcD. This approach will further drive the understanding of the <br /> SWTP's water quality and operational needs, allowing the City to make strategic, data-driven <br /> investments for the future. <br /> 1 <br />