Laserfiche WebLink
City's existing and proposed treatment processes for treating the above contaminants. <br /> While the presence and treatment requirements of these emerging contaminants will be <br /> considered, there are necessary limitations for stating defined treatment processes for <br /> emerging regulations. Since the details for these emerging considerations are forward <br /> looking,the treatment recommendations will also be forward looking.As a result,the <br /> analysis for establishing guiding design decisions will be qualitative in nature. <br /> 4) PRIMARY TREATMENT EXPANSION <br /> a) Obtain and review existing documentation, drawings, and operational data, including <br /> flow rates, raw water quality, and chemical dosages, for the two square solids contact <br /> clarifiers and the two Claricone units. Raw water data review will consider trends and <br /> compare changes between original raw water quality data on which the existing WTP was <br /> designed and raw water quality data from the last 5 years.This data will be from the <br /> previous 5 years and will include statistical consideration such as standard deviation for <br /> use in bookending statistically significant variances in the data. The purpose of these <br /> analyses is to become generally familiar with the current performance of the primary <br /> clarifiers and Claricones. Special consideration will be given to the impact of operating <br /> the Claricones at a greater pH than the square solids contact basins and how that would <br /> affect finished water quality with respect to TOC removal, residuals production and <br /> hardness removal. <br /> b) Analysis will focus on the time period when the existing solids contact clarifiers were <br /> carrying the entire treatment load (i.e. during Claricone construction). <br /> c) Field Performance Testing: <br /> i) Prepare and submit a testing plan to evaluate the performance of the existing square <br /> solids contact clarifiers under various hydraulic and solids loading rates to the City <br /> for approval. The testing plan will outline the proposed testing procedures, <br /> operational adjustments, and monitoring parameters intended to evaluate the <br /> clarifiers'performance under specific conditions. <br /> ii) Upon City review and approval of the testing plan, the City will conduct up to three <br /> (3)full-scale field performance tests on the existing primary clarifiers at incremental <br /> loading rates (e.g., 8 MGD, 10 MGD, 12 MGD, or maximum achievable) and three <br /> (3) different pH set points to evaluate performance limitations. The duration of testing <br /> at each different loading rate is proposed to last until equilibrium is reached. This is <br /> anticipated to take a minimum of 1 week but may last up to 4 weeks. BMcD will <br /> provide two (2) staff for up to three(3) days of testing,assumed to one day per round <br /> of testing to confirm collected water quality parameters. <br /> iii) Upon completion of the testing, data gathered and collected by the City during testing <br /> will be provided to BMcD to form the basis of the alternatives analysis. The data is <br /> anticipated to include effluent turbidity, pH, alkalinity,total hardness, flow, and <br /> sludge blanket stability, including mixer speed, rake arm torque, blowdown <br /> frequency, blowdown duration, blowdown solids, and sludge blanket elevation, on the <br /> primary clarifiers, Claricones, and combined effluent(except for sludge blanket <br /> stability). <br /> d) Identify and develop viable alternatives for the square solids contact clarifiers based on <br /> data analysis and field testing results. <br /> i) The alternatives are anticipated to include: <br /> 3 <br />