Laserfiche WebLink
Evaluation Procedures for Granular Media (total of 24 core samples). The core <br /> should be collected after each filter has been in service for a typical filter duration <br /> (or maximum allowable before breakthrough if required by higher loading rate). <br /> Core samples will be collected by the City. <br /> (3) Develop a solids retention profile per AWWA Filter Evaluation Procedures for <br /> Granular Media for each of the filters to determine depth of solids removal within <br /> the filter bed before and after backwash (by BMcD) <br /> (4) Evaluate the overall effectiveness of backwash process based on the collected <br /> flowrate,duration, and solids retention profiles(by BMcD). <br /> c) Develop conceptual designs and conceptual-level (AACE Class 5) cost estimates for the <br /> rehabilitation and/or replacement of filter media, underdrains, and backwash system <br /> components required to achieve a range of future target capacities. For the new filter <br /> building, identify a range of the number of new filters, associated building sizes, and <br /> filter material (sand/anthracite, GAC, etc.), and design flows the City could build and <br /> operate.A total of five (5) filter expansion/rehabilitation options will be considered. The <br /> analysis will include the following design considerations: <br /> i) Filter to Waste (FTW)provisions. <br /> ii) A new filter inlet concept to allow for improved isolation of existing filters for <br /> rehabilitation. <br /> iii) Backwash system modifications to support system upgrades, considering hydraulic <br /> requirements (minimum 20 feet of head pressure, with greater than 22 feet preferred). <br /> iv) Filter media improvements using dual-media(sand and anthracite). <br /> v) GAC sizing is dependent on empty bed contact time (EBCT). For the purposes of this <br /> task, 10-minute and 20-minute EBCT options will be evaluated. Prior to finalizing <br /> GAC, additional full scale pilot testing is suggested(excluded from this scope). <br /> d) Filter Expansion Workshop <br /> i) To be combined with the Clarifier workshop (see Task 3). <br /> ii) Organize and facilitate one (1) virtual workshop (up to 2 hours) with the City to <br /> present the findings of the filter analysis and the preliminary design alternatives. <br /> iii) The purpose of this workshop is to discuss the alternatives and for the City to select a <br /> preferred path forward for the preliminary design. <br /> iv) A summary of the workshop, which may be in the form of meeting minutes or notes <br /> and/or presentation slides, will be provided to document the decisions made by the <br /> City. <br /> 6) STORAGE AND DISINFECTION TANK ANALYSIS <br /> a) Analyze existing CT calculations to identify trends regarding amount of CT provided <br /> during different seasons. <br /> b) Compare the existing finished water storage capacity against current and projected future <br /> demands provided by the City. <br /> c) Develop a conceptual volume for a new CT basin(or tank) by analyzing the minimum <br /> required volumes for the following scenarios (1)high plant flow and low temperature <br /> restrictive conditions (2) low plant flow and high temperature restrictive conditions, and <br /> (3) average plant flow conditions. These scenarios will define the minimum, average, <br /> and maximum volumes needed for CT. The conceptual design will be based around an <br /> achieving an assumed minimum baffling factor of 0.7, per EPA Disinfection Profiling and <br /> 5 <br />