Laserfiche WebLink
Benchmarking Technical Guidance Manual and 10 State Standards. The tank will be <br /> sized in accordance based on the land available to be acquired from Illinois Department <br /> of Transportation (IDOT) and the spacing needs to build and maintain the new tank. <br /> d) Evaluate a single preferred site identified by the City for the location of the new CT and <br /> storage facilities. The site for the new tank will be located immediately southwest of the <br /> existing tank.No other location will be considered. <br /> e) Participate in a preliminary meeting with the IDOT to discuss site access and any <br /> potential right-of-way considerations (one virtual meeting included). <br /> f) Develop conceptual designs for the following. <br /> i) CT through modifications to the existing ground storage reservoir <br /> ii) CT through a new, dedicated prestressed concrete cylinder tank. <br /> iii) CT through a new, dedicated cast-in-place concrete tank. <br /> g) For each alternative, prepare a preliminary site layout and conceptual design for <br /> integrating the new facilities while maintaining existing plant operations. The conceptual <br /> design will include yard piping, preliminary sequencing, and baffling. Identify <br /> preliminary,proposed IDOT right-of-way property line to accommodate new storage tank <br /> construction. <br /> h) For each alternative, develop a conceptual-level (AACE Class 5) cost estimate. <br /> i) Storage and Disinfection Tank Workshop <br /> i) Organize and facilitate one (1) virtual workshop(up to 2 hours)with the City to <br /> present the conceptual design alternatives. <br /> ii) A summary of the workshop, which may be in the form of meeting minutes and/or <br /> presentation slides, will be provided to document the decisions made by the City. <br /> 7) RESIDUALS AND LAGOON IMPROVEMENTS <br /> a) Lagoon Improvements <br /> i) Evaluate and develop a conceptual design for improvements to provide increased <br /> flood protection and improve access to the lagoons. The conceptual design will <br /> include the following improvements: <br /> (1) Upgrade the inlet and pump structure for the lagoons to accommodate an increase <br /> in flow, as provided by the City. <br /> (2) Conceptual design for the floodwall around Lagoon 1, 2, and 3 to approximate <br /> elevation 608 ft. <br /> ii) The conceptual design will include conceptual site plans and critical elevations based <br /> on publicly available USGS (or equivalent)topographic data. <br /> b) pH Adjustment <br /> i) Develop conceptual designs for the following alternatives for a pH adjustment system <br /> suitable for occasional use to meet the pH discharge limit of 9.0 when lagoon <br /> supernatant is discharged. Conceptual design will include preliminary design criteria <br /> and general arrangement on a site plan for the storage and feed system. <br /> (1) A new CO2 storage and feed system located at the lagoon site <br /> (2) A new hydrochloric acid storage and feed system located at the lagoon site. <br /> (3) A new CO2 storage and feed system located at the WTP with a feed line to the <br /> lagoon site. <br /> ii) Develop a conceptual-level (AACE Class 5)cost estimate for the proposed site <br /> improvements. The estimate will include the major components of the design, <br /> 6 <br />