Laserfiche WebLink
including the lagoon berms and access road and the selected pH adjustment system <br /> alternative. <br /> c) Residuals Lagoons Improvements Workshop <br /> i) Organize and facilitate one (1)virtual workshop(up to 1 hour)with the City to <br /> present the conceptual designs for the lagoons and pH adjustment system system. <br /> ii) The purpose of this workshop is to gather feedback from the City and confirm the <br /> conceptual direction. <br /> iii) A summary of the workshop, which may be in the form of meeting minutes and/or <br /> presentation slides,will be provided to document the decisions made by the City. <br /> 8) CYBERSECURITY ASSESSMENT <br /> a) Conduct one(1) virtual meeting with the City to understand the City's current <br /> cybersecurity program. Meeting minutes will be provided. <br /> b) Review the WTP's Supervisory Control and Data Acquisition (SCADA) and process <br /> control network with input from the City and in accordance with National Institute of <br /> Standards and Technology(NIST)Cybersecurity Framework and Environmental <br /> Protection Agency (EPA) guidelines. <br /> c) Become generally familiar with the City's existing cybersecurity policies, procedures, <br /> and program. <br /> d) Compare existing network architecture, access controls, and password policies to industry <br /> best practices (i.e.AWWA Cybersecurity Guidance). <br /> e) Provide comments and perspective on the City's existing cybersecurity program. Identify <br /> potential areas of improvement. <br /> 9) PHYSICAL SITE SECURITY <br /> a) Information Gathering and Site Assessment <br /> i) Conduct a limited, non-intrusive site visit to visually observe current site conditions <br /> and existing physical security measures <br /> ii) Facilitate one (1) workshop (up to 2 hours) with key City stakeholders to discuss <br /> security zoning, access needs, and perimeter requirements. The workshop will occur <br /> during the site visit. Meeting minutes will be provided. <br /> iii) Review and become generally familiar with City-provided documentation, including <br /> the 2003 Vulnerability Assessment,the FBI security assessment report, conceptual <br /> perimeter sketch, City-provided IT specifications, Risk and Resiliency Assessment <br /> (RRA), Emergency Response Plan(ERP), and requirements regarding the planned <br /> access control system. <br /> b) Perimeter Security Detailing <br /> i) Develop a conceptual site plan for the physical perimeter expansion based on the City <br /> provided documents listed above. <br /> ii) Provide civil engineering and security design input specifically regarding the <br /> alignment and implementation of the standard 8-foot metal perimeter fence. <br /> c) Interior Security Zoning Analysis <br /> i) Based on review of the City's architectural layouts,provide input to establish <br /> designated "Medium Security" and "High Security" zones within the SWTP building. <br /> ii) Focus areas will include the SCADA server room, High Service (HS)pump station, <br /> and chemical storage areas (e.g., chlorine, fluoride). <br /> 7 <br />