Laserfiche WebLink
13)CONTINGENCY ALLOWANCE <br /> a) A contingency allowance of$50,000 is being provided for additional, out of scope <br /> services that may be required for work that has not been identified at this time. <br /> ASSUMPTIONS, CLARIFICATIONS,AND EXCEPTIONS <br /> The execution of this Scope of Work is based upon the following assumptions and clarifications: <br /> 1. The City will provide timely access to the project site, relevant facilities, and key personnel <br /> as required for workshops and site visits. <br /> 2. The City will furnish all available existing documentation, including as-built drawings, <br /> historical operational data, previous studies, and security assessment reports, in a digital <br /> format. <br /> 3. The City is responsible for providing any necessary topographic survey data for the project <br /> site. If a new survey is required, it can be added as a supplemental service. <br /> 4. The City will be responsible for the physical collection of the filter media core sample. <br /> 5. The City will perform up pH monitoring and flow monitoring for the lagoon blowdown to <br /> establish a baseline for the pH adjustment system design during normal and modified pH and <br /> loading rate testing. <br /> 6. BMcD is entitled to rely upon information or data received from or through the City without <br /> independent verification. <br /> 7. Third-party laboratory analysis costs are not included in this scope of work. <br /> 8. The analysis of any field testing(e.g., the filter loading study)will be specific to the <br /> operating conditions observed during the testing period. The findings are not a guarantee of <br /> future performance under all conditions. <br /> 9. Site visits will be limited to non-intrusive, visual observations of accessible areas. This scope <br /> does not include condition assessment,physical testing of equipment, destructive testing of <br /> materials, or entry into confined spaces. <br /> 10. The evaluation of structural, architectural, and geotechnical conditions is limited to a visual <br /> assessment of readily observable features.A detailed analysis of these systems is not included <br /> in this scope. <br /> 11. The calculation for the new CT basin volume is based on an assumed baffling factor of 0.7. <br /> The City acknowledges this is a standard assumption for a new, well-designed basin and that <br /> a tracer study would be required during a later design phase to confirm the as-built baffling <br /> factor. <br /> 12. All conceptual and preliminary designs will be based on readily available documentation and <br /> the results of the workshops. The designs will not include detailed calculations for systems <br /> outside the primary focus of this scope(e.g., detailed structural, HVAC, or plumbing <br /> systems). These conceptual and preliminary designs are not for construction.After the City <br /> reviews and approves the conceptual designs, they will be used solely and exclusively as the <br /> basis for developing the OPCC for each individual project. <br /> 13. BMcD does not warrant or guarantee that any cybersecurity recommendations or suggestions <br /> made will prevent future cybersecurity incidents. <br /> 14. The City will provide BMcD with information regarding the desired operational flexibility <br /> for each of the chemical feed systems to be evaluated. <br /> 15.New GAC for filters will not be implemented until full scale pilot testing is performed at a <br /> later date. Final empty bed contact time will also be confirmed at the end of the full scale <br /> pilot testing. <br /> 11 <br />