My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-125 Resolution Authorizing Agreement with INTERA Incorporated to Provide Professional Engineering Services to the City of Decatur for the Alternate Water Supplies Update, City Project 2024-05
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-125 Resolution Authorizing Agreement with INTERA Incorporated to Provide Professional Engineering Services to the City of Decatur for the Alternate Water Supplies Update, City Project 2024-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2026 10:49:25 AM
Creation date
6/24/2026 10:49:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-125
Res Ord Title
R2026-125 Resolution Authorizing Agreement with INTERA Incorporated to Provide Professional Engineering Services to the City of Decatur for the Alternate Water Supplies Update, City Project 2024-05
Department
Public Works
Approved Date
6/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> SCOPE OF WORK <br /> Introduction <br /> Over the last two years,the City of Decatur, IL(City) has discussed several commercial endeavors <br /> that would potentially increase water demand on Lake Decatur beyond the demand projected in <br /> INTERA's 2019 report to the City (Additional Water-Supplies: Local Solutions to Manage Drought <br /> Risk). In that report, a demand increase was projected, bringing the total lake demand (potable <br /> demand at the City's South Water Treatment Plant (SWTP) plus non-potable demand at ADM's <br /> North Water Treatment Plant (NWTP) from 32.3 million gallons per day (MGD) in 2017 to 38.5 <br /> MGD in 2050—a modest 6 MGD increase over approximately 30 years. <br /> Our analysis showed that during a worst-case drought, approximately 3,100 MG would be <br /> needed over a 10-month drought period to meet the projected demand. A selection of readily <br /> available water-supply options, in combination, were found to be capable of meeting the supply <br /> gap, most of which have been used in previous droughts. These include: 1) the DeWitt County <br /> wellfield (630 MG), 2) the former Vulcan Pit or "water mine" (250 MG), and 3) Lake Tokorozawa <br /> (900 MG).The most significant measure, however,was to allow the lake level to drop below 607' <br /> (ADM's NWTP west intake elevation) to the SWTP intake elevation of 604' (1,670 MG). <br /> Since the 2019 assessment was completed, the City has taken several steps to improve their <br /> drought resiliency. Pipeline was laid to provide a permanent connection between the former <br /> Vulcan Pit to the SWTP raw water intake building, allowing water from the pit to be used on- <br /> demand and coincidentally with treatment plant sludge decant water. When implemented, <br /> planned improvements to the existing wellfield will improve efficiency in delivering water to <br /> address lake level drops before drought impacts are fully realized. Additional farm property was <br /> purchased northwest of the DeWitt wellfield, potentially increasing the total yield from the <br /> Mahomet Aquifer should new wells be developed there. Rounding out current improvements to <br /> the City's water supply portfolio, the City purchased the Harristown Vulcan gravel pit several <br /> miles downstream from Decatur. Our analysis completed earlier this year determined that the <br /> pit can provide 900- 1,000 MG. <br /> Additional demands could increase the drought supply gap beyond 3,100 MG. These new <br /> demands may be met with a combination of potable and non-potable supplies, some of which <br /> were not evaluated in the 2019 report. The timing of the water supply needs will be highly <br /> dependent on the pace and type of development that occurs. Multiple variable growth scenarios <br /> need to be evaluated to prepare for a range of potential futures. To ensure that the level and <br /> rate of investment in new water supplies is appropriately matched to needs, an update to the <br /> 2019 adaptive management plan for implementing projects is recommended. <br /> In addition, the recent drought alerted City officials to Lake Decatur's drought sensitivity and the <br /> need to update the 2012 Low Lake Level/Drought Action Plan. An assessment of operating rules <br /> and action triggers can improve the balance between reliability and cost. This can ensure <br /> droughts are detected in time while minimizing the cost of corrective action. <br /> We propose to 1) assess the impact of additional water demand on Lake Decatur's drought <br /> resiliency and supply gap, 2) review previously evaluated and new water supply projects, 3) <br /> Last Revised:2/03/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.