My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-125 Resolution Authorizing Agreement with INTERA Incorporated to Provide Professional Engineering Services to the City of Decatur for the Alternate Water Supplies Update, City Project 2024-05
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-125 Resolution Authorizing Agreement with INTERA Incorporated to Provide Professional Engineering Services to the City of Decatur for the Alternate Water Supplies Update, City Project 2024-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2026 10:49:25 AM
Creation date
6/24/2026 10:49:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-125
Res Ord Title
R2026-125 Resolution Authorizing Agreement with INTERA Incorporated to Provide Professional Engineering Services to the City of Decatur for the Alternate Water Supplies Update, City Project 2024-05
Department
Public Works
Approved Date
6/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
update the triple-bottom-line analysis of water supply options, 4) provide updated <br /> recommendations on the timing of investments in those projects, and 5) apply decisions made <br /> during a May 2026 table-top drought exercise to guide the City on the amount and timing of <br /> demand cutbacks and alternative supply triggers. <br /> Scope of Work <br /> To achieve these objectives, the following tasks will be performed: <br /> 1. DEMAND PROJECTION SCENARIOS <br /> INTERA will review and finalize with City staff the timing and quantity of selected demand <br /> projections including potable and non-potable water demands. Rather than attributing <br /> future demand to specific industrial/commercial proposals, incremental demands of, for <br /> example, 5, 7, and 10 MGD, will be assessed. <br /> In this task, we will also review and finalize with City staff, a master list of possible supply <br /> alternatives and set aside alternatives no longer considered desirable. The number of <br /> supply alternatives to assess will be constrained to include: <br /> • Excavation of the former Vulcan Pit(water mine) <br /> • Vulcan Harristown gravel pit including excavation <br /> • Extended/expanded use of the Mahomet Aquifer <br /> • Sanitary District of Decatur(SDD) wellfield <br /> • Lake Tokorozawa with a direct lake intake or wells on adjoining SDD property <br /> • Continued use of the Cisco well <br /> 2. DEMAND SCENARIO MODELING <br /> INTERA will update the GOLDSIMTM model developed for the 2019 study, including new <br /> lake bathymetry, to refine the relationship between lake stage and storage volume. We <br /> will run the model with new water demand scenarios identified in Task 1 under the Design <br /> Drought condition established for the 2019 study.These modelled demand scenarios will <br /> provide a set of supply gaps that form the basis for assessing supply options. <br /> 3. SUPPLY OPTION ANALYSIS <br /> In this task, INTERA will screen the list of supply alternatives identified in Task 1 to those <br /> that are technically feasible and have the potential to meaningfully address the supply <br /> gaps identified above. We will provide clear reasons to exclude those alternatives that do <br /> not bear further investigation. <br /> The remaining existing and new supply options will be assessed to a comparable level of <br /> detail as was done in Section 6 Supplemental Sources of the 2019 report. This includes <br /> analyses of potential water supply quantities for each alternative. For new alternatives, <br /> 2 <br /> Last Revised:2/03/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.