My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-153 Resolution Authorizing a Professional Engineering Services Agreement with Clark Dietz Inc. to Provide Design Engineering Services for the North Summitt Avenue Drainage Improvements, City Project 2026-18
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-153 Resolution Authorizing a Professional Engineering Services Agreement with Clark Dietz Inc. to Provide Design Engineering Services for the North Summitt Avenue Drainage Improvements, City Project 2026-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2026 4:32:35 PM
Creation date
7/31/2026 4:32:33 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-153
Res Ord Title
R2026-153 Resolution Authorizing a Professional Engineering Services Agreement with Clark Dietz Inc. to Provide Design Engineering Services for the North Summitt Avenue Drainage Improvements, City Project 2026-18
Department
Public Works
Approved Date
7/20/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> 15. This Agreement does not include roadway typical section studies or pavement design studies. <br /> Existing and proposed typical section elements, including pavement cores and proposed <br /> pavement sections,will be provided by the City. <br /> 16. This Agreement does not include traffic data collection or traffic forecasting. <br /> 17. This Agreement does not include roadway lighting design. <br /> 18. This Agreement does not include utility potholing. <br /> 19. This Agreement does not include construction engineering services. Construction engineering <br /> services will be provided by a subsequent Agreement. <br /> 20. The project limits are bounded by Center Street to the south, McClellan Avenue to the East, <br /> Ravina Park Road to the north and Summit Avenue to the west, with some additional work <br /> possible west of Summit Avenue, north of Harrison Avenue. <br /> 21. This agreement does not include Geotechnical investigation. If those services are required, the <br /> City will provide that information as part of a separate agreement. <br /> 22. This agreement does not include the Powers Blvd. study area. That work will be covered in a <br /> separate agreement with the City. <br /> A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.