Laserfiche WebLink
June 2026 Bypass Plan at N MLK Crossing Revision 0 <br /> o Flow control measures and/or valving may be needed at the end of the bypass line to <br /> manage flow and pressure at the discharge point. <br /> f. Discharge <br /> o Discharge to MH 37-15 <br /> 5 Norfolk Southern <br />