My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-185 Resolution Authorizing the Execution of Agreement with the Norfolk Southern Railway Company for the Broadway Sewer Rehabilitation on Martin Luther King Jr. Drive, City Project 2022-01
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-185 Resolution Authorizing the Execution of Agreement with the Norfolk Southern Railway Company for the Broadway Sewer Rehabilitation on Martin Luther King Jr. Drive, City Project 2022-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2026 2:49:07 PM
Creation date
10/26/2026 2:49:05 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-185
Res Ord Title
R2026-185 Resolution Authorizing the Execution of Agreement with the Norfolk Southern Railway Company for the Broadway Sewer Rehabilitation on Martin Luther King Jr. Drive, City Project 2022-01
Department
City Manager
Approved Date
9/21/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PIPE DATA SHEET <br /> CARRIER PIPE CASING PIPE <br /> CONTENTS TO BE HANDLED Sewer <br /> MAX. ALLOWABLE OPERATING PRESSURE <br /> NOMINAL SIZE OF PIPE <br /> OUTSIDE DIAMETER <br /> INSIDE DIAMETER 72"x48" <br /> WALL THICKNESS <br /> WEIGHT PER FOOT <br /> MATERIAL Brick <br /> PROCESS OF MANUFACTURE <br /> SPECIFICATION <br /> GRADE OR CLASS <br /> (Specified Minimum Yield Strength) <br /> TEST PRESSURE <br /> TYPE OF JOINT <br /> TYPE OF COATING <br /> DETAILS OF CATHODIC PROTECTION <br /> DETAILS OF SEALS OR PROTECTION AT <br /> END OF CASING <br /> CHARACTER OF SUBSURFACE MATERIAL <br /> APPROXIMATE GROUND WATER LEVEL 6.5 Ft <br /> SOURCE OF INFORMATION <br /> ON SUBSURFACE <br /> CONDITIONS <br /> Proposed method of installation (refer to NSCE-8 Specification): <br /> Bore& Jack <br /> I I Jacking <br /> Tunneling (with Tunnel Liner Plate) <br /> Directional Bore/Horizontal Direction Drilling - Method A <br /> Directional Bore/Horizontal Direction Drilling - Method B <br /> n Open Cut-All installations directly under any track must be designed as a bored installation. Open cut <br /> installations will be considered on a case-by-case basis by Norfolk Southem's Division Superintendent at the <br /> time of installation. <br /> [XI Other- Please Specify: CIPP lining of existing sewer main. <br />
The URL can be used to link to this page
Your browser does not support the video tag.