Council Memo <br /> Public Works Department <br /> No. 2026-88 <br /> DATE: 11/2/2026 <br /> TO: Honorable Mayor Julie Moore Wolfe and City Council Members <br /> FROM: Melissa Hon, City Manager <br /> Matt Newell, Director of Public Works <br /> SUBJECT: Ordinance Authorizing the City of Decatur, Illinois to Borrow Funds from the Water Pollution <br /> Control Loan Program through the Illinois Environmental Protection Agency for the Broadway and Jasper <br /> Sewer Rehabilitation Project, City Project 2022-01 <br /> SUMMARY RECOMMENDATION: It is recommended that the City Council approve, and that the Mayor <br /> be authorized to execute the Loan Ordinance authorizing the City to Borrow Funds from the Water Pollution <br /> Control Program through the Illinois Environmental Projection Agency for the Broadway and Jasper Sewer <br /> Rehabilitation Project for the Broadway and Jasper Sewer Rehabilitation Project, City Project 2022-01. <br /> BACKGROUND: The City's large diameter critical sewers are sewers with diameters ranging from 3 to 7 feet. <br /> They are major trunk sewers that serve large areas of the City and are vital to the City's sewer system. There are <br /> 5 critical sanitary sewers that are owned and operated by the City: 7th Ward Sewer, McKinley Avenue Sewer, <br /> Union Street Sewer, Lake Shore Drive Sewer, and Broadway/Jasper Sewer. Failure of a critical sewer would <br /> have dire consequences for the City such as loss of service for large sections of the City,pollution of the land <br /> and our drinking water supply, very high repair costs and possibly significant private property and building <br /> damage. <br /> The Public Works Department prepared a Critical Sewers Rehabilitation Facilities Plan which was <br /> approved by the Illinois Environmental Protection Agency (IEPA) on February 4, 2013. The plan <br /> analyzed four of the five critical sanitary sewers; Lake Shore Drive Sewer, 7th Ward Sewer, McKinley Avenue <br /> Sewer and Union Street Sewer. The City has completed all rehabilitation work on the four critical sewers <br /> analyzed in the plan. <br /> At the initiation of the sanitary sewer master plan in 2009, the Broadway and Jasper St Sewer did not show <br /> significant signs of deterioration was not included in the facilities plan. Recent inspections have shown <br /> additional deterioration, initiating the need for rehabilitation. <br /> Broadway and Jasper Street Sewer <br /> The Broadway and Jasper St sewer was originally constructed circa 1890's and is a brick pipe varying in size <br /> from 36" to 84" in diameter, both circular and egg shaped. The Jasper Street relief sewer was constructed in the <br /> 1940's, a circular concrete pipe 54" in diameter. The Broadway and Jasper Street sewers start near Grand <br /> Avenue and combine at Martian Luther King Jr Dr. and Prairie St. The system then extends south until it <br /> connects to a diversion structure owned and operated by the Sanitary District of Decatur on South Main St. near <br /> the Greenwood Cemetery. The total footage of pipe is approx. 22,600 feet. See the attached location maps. <br /> Illinois Environmental Protection Agency (IEPA) State Revolving Loan Program <br />