Laserfiche WebLink
The IEPA Wastewater and Drinking Water loan programs provide low-interest loans through the State <br /> Revolving Fund (SRF). The SRF includes two loan programs: the Water Pollution Control Loan Program <br /> (WPCLP)which funds both wastewater and storm water projects, and the Public Water Supply Loan Program <br /> (PWSLP) for drinking water projects. The current year loan interest rate is 2.44%. <br /> Project Funding through the Water Pollution Control Loan Program <br /> The passage of an ordinance authorizing a loan agreement to borrow funds from the Water Pollution Control <br /> Loan Program is one of the final steps in securing an IEPA low interest loan. The ordinance addresses the <br /> funding for the project and assures that the City is able to repay the loan over a 20-year time period beginning at <br /> the substantial completion of the project. The funds included in the loan request are summarized in the <br /> following table: <br /> Work Item Project Estimate <br /> Design Engineering $379,700 <br /> Construction $17,200,000 <br /> Construction Contingency(10%) $1,720,000 <br /> Construction Engineering $1,320,000 <br /> Total Estimated Project Cost $20,619,700 <br /> Construction Period Interest (1.5%) $309,296 <br /> Sub-Total $20,928,996 <br /> Total Loan Requested $21,000,000 <br /> The project was identified in the IEPA's FY 2027 Intended Use Plan published on July 1, 2026, for a budget of <br /> $20,640,000 with principal forgiveness up to $6,192,000. As is common with the loan program, the actual loan <br /> document will not be fully written until a construction contract has been awarded by the City Council and <br /> approved by the IEPA. At that point, the loan agreement authorized by the ordinance will be signed by the City <br /> Manager and the loan activated. The contractor will then be given notice to proceed. <br /> Construction Engineering Services <br /> The IEPA requires that projects being supported by the Water Pollution Control Loan Program be provided with <br /> project oversight by qualified resident engineers that are familiar with the water treatment work being proposed. <br /> A construction engineering agreement will be brought to the Mayor and Council at the same time that a <br /> construction contract is to be awarded. <br /> LEGAL REVIEW: The Loan Ordinance was reviewed on October 9, 2026. <br /> PRIOR COUNCIL ACTION: <br /> See Appendix A for a listing of prior Council actions. <br /> SANITARY SEWER PRIORITIES: <br /> Under the direction of the City Council, the Public Works Department has established four priorities to improve <br /> the City's sanitary sewer collection system as defined in the Sanitary Sewer Master Plan. <br />