My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-48 STIPULATED AGREEMENT 1855
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-48 STIPULATED AGREEMENT 1855
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:18 AM
Creation date
7/22/2015 8:27:47 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-48
Res Ord Title
STIPULATED AGREEMENT 1855 FOR IMPROVEMENTS TO 27TH STREET HIGHWAY - RAIL GRADE CROSSING
Approved Date
4/20/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> SA 1855 - EXHIBIT B <br /> FHawcmartdw<< oe� order of Magnitude Estimate <br /> Amanda DeCesare Proiect Information <br /> CSX Public Projects Outside Paq: ILDOT <br /> 500 Meijer Dr.,Ste.305 Street Name: 27th St. Railroad M.P.: BD-275.41 <br /> Ci : Decatur <br /> Florence, KY 41042 State: Illinois DOT#: 154642P <br /> Telephone (859)372-6124 County: Macon <br /> T lc2;-nal Installation <br /> PROJECT DESCRIPTION:27th St.-Install crossing warning devices (FLS&G)with CWT detection equipment, <br /> event recorder,remote monitoring and simultaneous preemption. The project total includes cost for 3 days <br /> flagging services for installation of the interconnect cable to the traffic controller cabinet. <br /> Engineering Costs: $ 12,360.00 <br /> Preliminary Engineering $ 16,800.00 <br /> Contract En ineering $ 6,019.00 <br /> Construction Engineering 35,179.00 <br /> Total Engineering Costs: $ <br /> Material Costs: $ 25,195.14 <br /> Shop Material $ 41,613.34 <br /> Field Material $ 6,345.00 <br /> Material Shipping (Freight $ _ <br /> Sales Tax $ 2,500.00 <br /> AC Power <br /> Additional Items Total Material Costs: $ 75,653.48 <br /> Equipment Costs: <br /> Company Owned $ 276.00 <br /> Rental276.00 <br /> Total Equipment Costs: $ <br /> Labor Costs: $ 43,124.00 _ <br /> Construction Labor ! $ 1,941.00 <br /> Shop Labor $ 47,692.00 <br /> Additives for Construction Labor $ 2,30.7.00 <br /> Additives for ShopLabor 15,080.00 <br /> Meals and Lodging (Substistence) Total Labor Costs: $ 110,144.00 <br /> Miscellaneous Costs: $ 4,000.00 <br /> Vaccum Truck Rental <br /> Scott Elliott ' - 3/4/2015 Total Miscellaneous Costs: $ 4,000.00 <br /> Subtotal: <br /> Prepared By: _ $ 225,252.48 <br /> Signature: Contingency: $ 56,313.12 <br /> Total: $ 281,565.60 <br /> Disclaimer:This Order of magnitude Estimate Shall not be used In the Negotiation of Preliminary Engineering,vaConstruction,or Maintenance <br /> Agreements <br /> s lements.This Estimate is not valid fo for material orfund ng CSX tLabor forces.Actual costs may varyy pending full design and <br /> nce <br /> A <br /> 9e <br /> detailed estimate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.