My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-48 STIPULATED AGREEMENT 1855
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-48 STIPULATED AGREEMENT 1855
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:18 AM
Creation date
7/22/2015 8:27:47 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-48
Res Ord Title
STIPULATED AGREEMENT 1855 FOR IMPROVEMENTS TO 27TH STREET HIGHWAY - RAIL GRADE CROSSING
Approved Date
4/20/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA 1855 - EXHIBIT B1 <br /> City of Decatur; Illinois <br /> #1 Gary K.Anderson Plaza <br /> Decatur,IL 62523-1196 <br /> ORDER OF MAGNITUDE COST ESTIMATE <br /> Proiect Description: 27th Street/Rt.36 at-grade CSX Railroad Crossing,install conduit and <br /> interconnection cable between existing traffic signal control cabinet and proposed <br /> relocated RR cabinet. Conduit is to be installed by directional bore under the CSX tracks. <br /> Description Estimate <br /> 3"PVC Augered $9,300 <br /> Interconnect Cable $700 <br /> Railroad Protective liability Insurance $10,000 <br /> Total Estimated Construction Costs $20,000 <br /> Design and Construction Engineering(15%) $3,000 <br /> CSX Utility Encroachment Review Fee $4,000 <br /> Total Estimated Project Costs $27,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.