My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-48 STIPULATED AGREEMENT 1855
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-48 STIPULATED AGREEMENT 1855
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:18 AM
Creation date
7/22/2015 8:27:47 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-48
Res Ord Title
STIPULATED AGREEMENT 1855 FOR IMPROVEMENTS TO 27TH STREET HIGHWAY - RAIL GRADE CROSSING
Approved Date
4/20/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA 1855 <br /> (a) installation of automatic flashing light signals and gates with a bell, controlled by <br /> constant warning time circuitry, equipped with an event recorder and a remote . <br /> monitoring system, and designed for a minimum simultaneous preemption time <br /> of 25 seconds, by the Company. <br /> (b) Installation of a railroad interconnect cable from the railroad crossing controller <br /> unit inside the new railroad crossing signal bungalow to a junction box mounted <br /> on the outside of the new railroad crossing signal bungalow, by the Company. <br /> [Note:The junction box shall be securely locked with a padlock provided by the Company.] <br /> (c) Installation of a railroad interconnect cable from the junction box mounted on the <br /> outside of the new railroad crossing signal bungalow to the existing traffic signal <br /> controller unit inside the existing traffic signal control cabinet, by the City. <br /> [Note:The railroad interconnect cable shall be three conductor stranded#14 copper cable <br /> in a clear polyester binder,shielded with#36 AWG tinned copper braid with 85%coverage, <br /> and insulated with .016" polyethylene (black, blue, red). The jacket shall be-black 0.045 <br /> PVC or polyethylene.] <br /> northeast hi hwa <br /> (d) Rehabilitation of the g Y approach, to meet the minimum <br /> requirements of 92 Ill. Adm. Code 1535.204 (Exhibit C), by the City. <br /> (e) Renewal of the railroad advance warning pavement markings ("RXR") on the <br /> northeast and southwest highway approaches, in accordance with the minimum <br /> requirements of 92 III. Adm. Code 1535.310 (Exhibit C1) and the most current <br /> revision of the Manual on Uniform Traffic Control Devices (MUTCD), by the City. <br /> (f) Renewal of the pavement cross-hatching and stop bars on the northeast and <br /> southwest highway approaches, in accordance with Exhibit C2, by the City. <br /> Section 3 The Company has provided a preliminary"order of magnitude" cost estimate <br /> (Exhibit B)for the installation of automatic flashing light signals and gates and installation of <br /> a railroad interconnect cable from the railroad crossing controller unit inside the new railroad <br /> crossing signal bungalow to a junction box mounted on the outside of the new railroad <br /> crossing signal bungalow. The Company shall, upon issuance of a Commission Order, <br /> according to the requirements contained therein, prepare and submit duplicate copies of <br /> detailed drawings, detailed circuit plans, cost estimates and y required specifications for <br /> The Company agrees that <br /> the proposed improvements for the approval of the Commission. <br /> an appropriate time for the submission of plans should be ninety (90) days from the date of <br /> a Commission Order approving this Agreement. <br /> The City has provided a preliminary"order of magnitude" cost estimate (Exhibit 131) for the <br /> installation of railroad interconnect cable from the junction box mounted on the outside of <br /> the new railroad crossing signal bungalow to the existing traffic signal controller unit inside <br /> the existing traffic signal control cabinet. The City shall, upon issuance of a Commission <br /> Order, according to the requirements contained therein, prepare and submit any required <br /> drawings and specifications for the interconnect cable run for the approval of the <br /> Commission and IDOT. The City agrees that an appropriate time for the submission should <br /> be ninety (90) days from the date of a Commission Order approving this Agreement. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.