|
SA 1855
<br /> Since the northeast highway approach grade rehabilitation and pavement marking .
<br /> application at the crossing will be performed by the City or its contractor at least partly on
<br /> the Company's right-of=way, flagging and contractor liability insurance will be required for
<br /> said work.
<br /> The Company is responsible for all future costs associated with the operation and
<br /> maintenance of the new automatic warning devices in accordance with the following parts
<br /> of Title 49 - Code of Federal Regulations (CFR): 49 CFR 214 - Railroad Worker Safety;
<br /> 49 CFR 22B - Hours of Service of Railroad Employees; 49 CFR 233 - Signal Systems
<br /> Recording Requirements; and, 49 CFR 234 - Grade Crossing Signal System Safety.
<br /> The City shall submit any required drawings and specifications for the interconnect cable
<br /> run to the Commission's Railroad Safety Section and Roger Driskell, Illinois Department of
<br /> Transportation, Region 4 Engineer, District 7 Attn: Joshua Porter, Traffic.Signal Systems
<br /> Engineer, 400 West Wabash, Effingham, IL 62401.
<br /> The Company and the City shall each review the Project Manager Information portion of the
<br /> Project Status Report sheets, attached as Exhibits E and E1, respectively. If any changes
<br /> are required, the sheets are to be corrected and sent with this executed Agreement.
<br /> The Company and the City shall each, at six (6) month intervals from the date of the
<br /> Commission Order approving this Agreement, submit to the Director of Processing and
<br /> Information, Transportation Bureau of the Commission, a Project Status Report, attached
<br /> as Exhibit E (Company)and Exhibit E1 (City) regarding the progress each has made toward
<br /> completion of the work required by this Agreement. Each Project Status Report shall include
<br /> the Commission Order's docket number, the Order date, the project completion date as
<br /> noted in the Order, crossing information (inventory number and railroad milepost), type of
<br /> improvement, and the name, title, mailing address, phone number, facsimile number, and
<br /> electronic mailing address of the Company and City Project Manager.
<br /> All bills for the City's interconnect cable run from the junction box mounted on the outside of
<br /> the new railroad crossing signal bungalow to the existing traffic signal controller unit
<br /> specified in Section 2 of this Agreement authorized for reimbursement from the Grade
<br /> Crossing Protection Fund shall be submitted to Roger Ddskell, Illinois Department of
<br /> Transportation, Region.4 Engineer, District 7 Attn: Maureen Kastl, Engineer of Local
<br /> Roads and Streets, 400 West Wabash, Effingham, IL 62401. Upon review and approval
<br /> of the bills, personnel from District 7 will submit an invoice to the Fiscal Control Unit, Bureau
<br /> of Local Roads and Streets, Illinois Department of Transportation,2300 S. Dirksen Parkway,
<br /> Springfield, IL 62764. All bills for the Company's automatic warning devices specified in
<br /> Section 2 of this Agreement authorized for reimbursement from the Grade Crossing
<br /> Protection Fund shall be submitted to the Fiscal Control Unit, Bureau of Local Roads and
<br /> Streets, Illinois Department of Transportation, 2300 S. Dirksen Parkway, Springfield, IL
<br /> 62764. All bills shall meet the minimum documentation requirements set forth in Section
<br /> 8 of this Agreement. All bills will be paid in accordance with the State Prompt Payment
<br /> Act as currently enacted (Illinois Compiled Statutes, 30 ILCS 540n.
<br /> The Department shall send a copy of ail invoices to the Director of Processing and
<br /> Information, Transportation Bureau of the Commission. All bills shall be submitted no
<br /> later than twelve (12)months from the completion date specified in the Commission Order
<br /> 4
<br />
|