My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-28 AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-28 AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:18 AM
Creation date
7/22/2015 1:16:00 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-28
Res Ord Title
AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC. TO DESIGN THE MCKINLEY / 7TH WARD SEWER REHABILITATION
Department
Public Works
Approved Date
3/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iu.e � Ty <br /> Uri <br /> STG NA p v <br /> Figure 5 The view of the McKinley Sewer between on Keller near Central taken in 2008 (on the left) is <br /> brought into much better focus using high definition inspection cameras now available <br /> (2014 image on the right). Flow line erosion and infiltration stains are readily visible. <br /> Table 1. Probable Cost of Union Street Sewer Rehabilitation <br /> Description Probable Cost <br /> Construction Estimate $6,750,000 <br /> Design Engineering Cost $297,000* <br /> Construction Engineering Estimate $500,000 <br /> Total $7,547,000 <br /> * The design cost is the current proposal from BGM and is approximately 4.4%of the total <br /> construction estimate. <br /> The increased damage may require that most of the sewers be lined whereas the original plan was to line <br /> limited segments and inject chemical grout into the remaining areas of the sewer. The need to line the <br /> sewers increases costs significantly. The scope of services provided by BGM contains additional <br /> televising to fully inspect the sewers with the updated high definition cameras which will provide a more <br /> thorough picture of the sewer's condition and enable the proper rehabilitation strategy to be applied. <br /> The 7`h Ward Sewer in particular is old and extends under many buildings, including at least four on the <br /> Millikin University campus. <br /> Design work for the McKinley Avenue and 701 Ward sewers is to be completed by the end of the year <br /> with construction to begin summer of 2016. As with the Lake Shore Drive Sewer and the Union Street <br /> Sewer, it is proposed that a low interest loan be secured through the Illinois Environmental Protection <br /> Agency to fund the design and construction costs. The additional televising included in the scope of <br /> services will be included as part of the design costs and therefore will be part of the loan. Due to the <br /> savings realized in the Lake Shore Drive and Union Street sewer projects, the added cost for the <br /> McKinley Avenue and 7`h Ward sewers are still within the overall cost projected at the outset of the <br /> planned critical sewer work. <br /> Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.