My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-19 ACCEPTING THE BID AND AUTHORIZING A CONTRACT Transfer House Structural Repairs
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-19 ACCEPTING THE BID AND AUTHORIZING A CONTRACT Transfer House Structural Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:18 AM
Creation date
7/23/2015 10:54:29 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-19
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING EXECUTION OF CONTRACT FOR TRANSFER HOUSE STRUCTURAL REPAIRS
Department
Public Works
Approved Date
3/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Description <br /> The repair of the Transfer House roof trusses consists of removing and replacing the lower <br /> wooden chord with a steel I-beam. In order to make the repair, it will be necessary to remove the <br /> existing HVAC system, the remaining interior wall structure, and all lighting fixtures. Because <br /> it is located directly under a truss, the building's electric circuit breaker box will be relocated to <br /> the east wall near the north east corner. Since the existing HVAC system is over 20 years old, <br /> not in working condition and not energy efficient, it will not be reinstalled. <br /> The new steel I-beam will be covered by a wood surface so it has the appearance of a wood <br /> beam. The existing fluorescent light fixtures will be reinstalled along the bottom of the beam to <br /> provide illumination as needed. <br /> No other interior finishing work is included in the Transfer House Structural Repair project. <br /> Bidding <br /> The project plans and specifications were prepared by the Farnsworth Group, Inc. The project <br /> was advertised on Wednesday, January 28, 2015, and bids were opened on Friday, February 20, <br /> 2015. The results for the letting are as follows: <br /> ._._..................-..........-........._.__. <br /> Compared to <br /> Engineer's Est. <br /> Bidder I Bid Price Over -Under) <br /> ---- . -- <br /> 4MC Corporation $63,575.00 <br /> 29.36% <br /> Otto Baum Company, Inc. I $83,800.00 (-6.89%) <br /> Engineer's Estimate _ $90,000.00 -- <br /> Recommended Award <br /> The City does not have project experience with the 4MC Corporation. They are a general <br /> contractor located in Argenta; Illinois. Five recent construction references were provided and <br /> contacted by City staff. All references indicated that 4MC was an excellent firm capable of <br /> performing the project. Staff recommends that the City Council approve a contract with 4MC <br /> Corporation to perform the Transfer House Structural Repair project. <br /> SCHEDULE <br /> The project is scheduled to begin in March and will be completed in June. <br /> BUDGET/TIME IMPLICATIONS: <br /> Budget Impact: Funding for this project is allocated in the Bond Fund. The recommended low <br /> bid amount is $63,575. <br /> Staffing Impact: Staff time has been allocated in the Capital Improvement Plan. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution and bid award. <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.