My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-19 ACCEPTING THE BID AND AUTHORIZING A CONTRACT Transfer House Structural Repairs
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-19 ACCEPTING THE BID AND AUTHORIZING A CONTRACT Transfer House Structural Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:18 AM
Creation date
7/23/2015 10:54:29 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-19
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING EXECUTION OF CONTRACT FOR TRANSFER HOUSE STRUCTURAL REPAIRS
Department
Public Works
Approved Date
3/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' GENERAL CONDITIONS <br /> GC-16 METHOD OF PAYMENT (continued) <br /> ' The failure, to perform any requirement, obligation, or term of the contract by the <br /> Contractor shall be reason for withholding any progress payments until the Department <br /> determines that compliance has been achieved. Furthermore, progress payments may be reduced <br /> ' by liens filed pursuant to Section 23(c)of the Mechanics Lien Act, 770 ILCS 60/23(c). <br /> GC-17 NO PARKING SIGNS <br /> The Engineering Division will erect "No Parking" signs 24 hours prior to the start of <br /> work on a street, in an attempt to have all vehicles removed from the street. The City will not be <br /> ' held responsible for any delays due to the City having to have parked vehicles moved. The <br /> Contractor shall furnish the Engineer with suitable hardwood quality lath (drawing contained in <br /> these specifications) and a suitable quality and quantity of paint to erect "No Parking" signs, and <br /> to mark utilities. This cost will be considered incidental to the contract. <br /> GC-18 PERMITS <br /> It is the Contractor's responsibility to obtain all necessary permits. Any costs incurred in <br /> obtaining these permits are to be incidental to the related contract item. Permit fees will be <br /> ' waived for those permits issued by the City of Decatur. <br /> GC-19 DOCUMENTATION OF EXISTING CONDITIONS <br /> The Contractor shall provide digital video and/or detailed photographs of existing <br /> facilities along the route or area of all construction, prior to the start of such construction. <br /> ' Construction of this facility will generally be along street right-of-way containing trees, bushes, <br /> fences, driveways and similar items. Special attention shall be given to coverage of the entire <br /> easement and immediate adjacent areas which might be disturbed during construction. <br /> The video and/or photographs shall be adequate to serve as a basis for comparison in <br /> determining whether the terms of,the specifications with respect to replacements, restoration <br /> and/or preservation of existing surfaces have been complied with. Copy(s) of the video and/or <br /> photographs taken shall be given to the Engineer for his files. The cost for this item shall be <br /> included in the respective prices for the various items of work. <br /> GC-20 PREVAILING WAGE RATES <br /> The Contractor shall supply the Engineer with weekly certified copies of the payroll for <br /> both the prime Contractor and their subcontractors and further comply with all State and Local <br /> rules and policies regarding Prevailing Wages. The Engineer will monitor the payroll for <br /> ' compliance with the applicable "prevailing wage rates" as required by the Special Conditions of <br /> this contract. <br /> ' 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.