Laserfiche WebLink
GENERAL CONDITIONS , <br /> GC-21 PROJECT MAINTENANCE <br /> Should the City become aware of an unsafe condition existing within the scope of this ' <br /> project, the City will attempt to contact the Contractor to resolve the unsafe condition. However, <br /> if the City is unable to contact the Contractor's designated representative or if the Contractor fails <br /> to respond within a reasonable period, the City will perform the necessary operations and the ' <br /> cost for labor, equipment and materials will be deducted from the contract. <br /> GC-22 ROYALTIES, PATENTS AND COPYRIGHTS <br /> The Contractor shall pay all royalties and license fees. The Contractor shall defend suits <br /> or claims for infringement of copyrights and patent rights and shall hold the Owner and Engineer , <br /> harmless from loss on account thereof, but shall not be responsible for such defense or loss when <br /> a particular design, process or product of a particular manufacturer or manufacturers is required <br /> by the Contract Documents or where the copyright violations are contained in Drawings, <br /> Specifications or other documents prepared by the Owner or Architect. However, if the <br /> Contractor has reason to believe that the required design, process or product is an infringement <br /> of a copyright or a patent, the Contractor shall be responsible for such loss unless such ' <br /> information is promptly furnished to the Architect. <br /> GC-23 SAFETY , <br /> The Contractor shall be responsible for the safety of all persons on the work, and shall <br /> exercise all necessary precautions and furnish necessary material to provide for the safety and ' <br /> protection of all persons on the work. The Contractor shall comply with the safety provisions of <br /> applicable building codes, Municipal, County, State and Federal, and provisions of the <br /> Occupational Safety and Health Act of 1970, and the standards established thereunder. , <br /> The Contractor is solely responsible for any and all procedures, methods, structures or <br /> equipment submitted or employed. The acceptance thereof shall not in any manner relieve the <br /> Contractor of any liability whatsoever on account of any procedures or methods employed by <br /> them, or due to any failure or movement of any structures or equipment furnished by them. <br /> GC-24 SCHEDULE NOTIFICATION <br /> It shall be the responsibility of the Contractor to notify the Engineering Division, in ' <br /> writing, of the schedule of street closures for the following week. The Engineering Division will <br /> notify the local media and return a copy of the media release to the Contractor. <br /> This work shall be considered as incidental to the contract and no additional <br /> compensation will be allowed. <br /> GC-25 TAXES , <br /> Pursuant to Department of Revenue, Illinois Retailer's Occupation Tax Rule 15(4), sales ' <br /> of materials for incorporation into Owner's real estate are exempt from retailer's occupation tax <br /> and use tax. However, sales of tools, fuel, lumber for forms, and other end use or consumption <br /> items which are not incorporated into Owner's real estate are taxable sales. ' <br /> 27 , <br />