Exhibit A <br /> b. Intersection Turning Movement Counts. The AECOM team will collect up to 12 <br /> intersection turning movement counts during the a.m. and p.m.peak hours. The a.m. <br /> and p.m. peak hours will be determined using data from the 24-hour traffic counts <br /> (described in the previous sub-task). In order to efficiently utilize the data collection <br /> time/budget,the project team proposes to collect the turning movements at each <br /> location for one hour in the a.m. peak hour,and one hour in the p.m. peak hour. In <br /> total,a maximum of 12 locations will total 24 hours of intersection turning movement <br /> data. This task also includes additional time for the project team to enter/review data in <br /> an Excel format for further analysis. <br /> 2. Update 2040 Socioeconomic Data. Following a review of current planning documents,and the <br /> initial round of stakeholder meetings,the project team will review the need to update the 2040 <br /> socioeconomic data. Based on the input received,the project team could refine the model data <br /> to reflect increased economic activity within the MIP study area. <br /> 3. Run Travel Demand Model. The project team will run the travel demand model to evaluate <br /> potential capacity improvements within the MIP study area. At a minimum, it is anticipated that <br /> the model will be used to evaluate the Beltway,Ash Avenue extension,and a Woodford Avenue <br /> extension. The model results will be analyzed and incorporated into the more detailed <br /> intersection and corridor analysis that will be performed by project team for the MIP study area. <br /> The project team will run a future year scenario that uses the current 2040 DUATS <br /> socioeconomic data,or the revised 2040 MIP data if necessary. The primary output from the <br /> regional model will be future year traffic volumes and a planning level volume-to-capacity(level <br /> of service)analysis. <br /> 4. Run Synchro(intersection and corridor). The project team will utilize the Synchro software to <br /> evaluate intersection level of service at key intersections within the study area. The project <br /> team will input the a.m. and p.m. peak hour intersection turning movements that will be <br /> collected as part of the MIP study. The data will be used to describe existing transportation <br /> conditions and intersection level of service. Results of the regional travel model,and input from <br /> the stakeholder meetings,will also be used to develop future year intersection turning <br /> movements. The project team will modify the intersection turning movements as needed to <br /> reflect potential improvements,or intersection geometric improvements,to key intersections, <br /> or to reflect possible new roadways,or roadway connections. Synchro will be used to present <br /> existing and future year level of service results and will also be used as an input to SimTraffic. <br /> SimTraffic will be used to display the impacts/benefits of potential improvements and will also <br /> be used to develop network wide measures of effectiveness that will be used to identify priority <br /> projects. <br /> 5. Run RTC Model. The project team will utilize the existing RTC model to evaluate at-grade rail <br /> crossing delays within the MIP study area. Based on the future year development <br /> plans/assumptions,the project team will develop a possible future year rail scenario. The future <br /> year rail scenario will be developed in conjunction with local officials as there are several factors <br /> that could influence a future year rail scenario (i.e.,increased train length, additional trains, <br /> adjusted train schedules,etc.). The future year rail scenario will be used to help the project <br /> team determine if potential grade separations might be evaluated as part of the CIP. <br /> A-4 <br />