My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-11 AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-11 AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:16:08 AM
Creation date
7/23/2015 11:16:04 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-11
Res Ord Title
AUTHORIZING AGREEMENT WITH URS CORPORATION FOR PREPARATION OF MIDWEST INLAND PORT TRANSPORTATION PLAN AND CAPITAL IMPROVEMENTS PLAN
Department
Public Works
Approved Date
2/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> • Determine if provisions will be required for transit stops and non-motorized facilities <br /> • Determine if new traffic signals are warranted at any locations within the MIP study area <br /> 4. Additional Model Runs. In the process of identifying and evaluation conceptual improvements, <br /> it is likely that some additional model runs will be needed to verify results,or test alternative <br /> improvements. As such,the project team has included additional time to conduct follow-up <br /> model runs. <br /> 5. Additional Level of Service Analysis. As a follow-up to additional model runs,the project team <br /> will conduct additional level of service analysis to evaluate potential impacts on the overall MIP <br /> Transportation Plan recommendations. <br /> 6. Prepare mosaic base sheets from aerial tiles. <br /> 7. Review and extract property information provided by the City of Decatur.Add property lines to <br /> base sheets. <br /> 8. Add utility information to base sheets. <br /> Task 05000—Prepare Draft&Final Report-TP <br /> The AECOM team will compile the transportation plan data and analysis to develop a draft and final MIP <br /> Transportation Plan. The MIP Transportation Plan will be used to as input into the CIP portion of the <br /> study. The MIP Transportation Plan report will include the following: <br /> 1. Purpose and Need <br /> o Summarize MIP study in context of other recent studies (DUATS 2040 LRTP, DATES, <br /> Brush College Corridor,other studies) <br /> o Document market trends and potential freight opportunities within the Decatur region <br /> o Statewide freight issues and projections (specifically, how does this impact the Decatur <br /> region) <br /> o MIP study area transportation opportunities <br /> ■ Roadways <br /> ■ Rail <br /> ■ Aviation <br /> ■ Other modes (Transit and Non-Motorized) <br /> o MIP study area Economic Development opportunities <br /> ■ Current land use <br /> ■ Planned improvements <br /> 2. Existing transportation conditions(focus on MIP study area) <br /> o Document current travel patterns <br /> o Document multi-modal/intermodal facilities within the study area (roadways, rail, <br /> transit, non-motorized) <br /> o Document transportation deficiencies <br /> o Document stakeholder needs(what are the transportation infrastructure needs) <br /> A-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.