Laserfiche WebLink
City of Decatur Exhibit A �C�� <br /> Midwest Inland Port Transportation Plan and Capital Improvements Plan <br /> Engineering Manhour and Fee Estimate <br /> Labor Multiplier= 2.70 <br /> Cost Escalation: <br /> (1)Assume 112 of work will be performed in 2015 and 12 in 2016 <br /> (2)Assume 3%pay increase <br /> (3)Escalation Factor=(0 5x1 0+1.03)= 1.015 <br /> Overall Labor Multiplier= 2.70 x 1.015 = 2.7405 <br /> MIP Tasks&Manhours-1-12-15 A-16 <br />