My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-11 AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-11 AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:16:08 AM
Creation date
7/23/2015 11:16:04 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-11
Res Ord Title
AUTHORIZING AGREEMENT WITH URS CORPORATION FOR PREPARATION OF MIDWEST INLAND PORT TRANSPORTATION PLAN AND CAPITAL IMPROVEMENTS PLAN
Department
Public Works
Approved Date
2/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Decatur Exhibit A AU-COM <br /> Inland Port Transportation Plan and Capital Improvements Plan <br /> Engineering Manhour and Fee Estimate <br /> Projed Deputy Sr.Chrill Civil civil civil Tech Admin t$69 <br /> Raw as <br /> Task Manager PM-CIP Engineer Modeler neer .1 Eng,2 E .3 PM-TP Totals labor labor <br /> Stakeholder Meetln 01000 <br /> Issues dentification 4.0 2. 0 0 0.0 0.0 0. 0.0 <br /> Review anal sis/cone I improvements 24.0 32.0 0 0 0.0 0.0 0 0 0.0 0 0 0.0 0.0 3.0 59.0 $4073.64 $11163.81 <br /> Pre re stakeholdermeati minutes 0.0 12.0 00 0.0 0.0 0.0 00 0.0 0.0 00 0.0 12.0 $817.92 $2241.51 <br /> Prere documents for meetin 0.0 120 0.0 00 0.0 8.0 0.0 0.0 0.0 0.0 0.0 20.0 $1,071.04 $2,935.19 <br /> Data CTotal is ask .0 .0 0. 0.0 0. .0 0.0 150.0 1 $10,036.24 <br /> a on(01500) $27,5043 <br /> Collect ublity information 00 120 0.0 0.0 0.0 0.0 320 0.0 0.0 0.0 0.0 44.0 $43.67-7-1,921.28 $5,265.2 <br /> Ida e <br /> deficiencies 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 00 0.0 000 $0.00 <br /> Obtsin/Load d'me41 aerial mappino 0.0 0.0 0.0 0.0 0.0 0.0 40 0.0 0.0 0.0 00 4.0 $34.48 137 92 $377.97 <br /> Review/extract property Information 0.0 0.0 00 0.0 0.0 00 6.0 0.0 0.0 0.0 0.0 6.0 $34.48 206.88 $566.95 <br /> Total This as 12.0 0.0 0.0 42.0 00 0.0 0.0 <br /> Wse(02000) 1 <br /> Data Collection 0.0 0.0 0.0 0.0 0.0 36.0 0.0 0.0 36.0 00 6.0 78.0 7.391 $2.136.24 $5,854.3 <br /> Uto 2040 Soci economic Data 00 0.0 0.0 0.0 0.0 8.0 00 0.0 0.0 0.0 8.0 16.0 3.24 $691.84 $1,89599 <br /> Run Travel Demand Model 00 0.0 0.0 48.0 12.0 0.0 0.0 0.0 0.0 0.0 00 60 0 33.26 $1,995.60 $5,468.9 <br /> Run S nchro Intersection and corridor 0.0 0.0 00 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 100.0 $43.68 $4 368.00 $11,970.50 <br /> Run RTC Model 0.0 0.0 600 0.0 0.0 0.0 0.0 00 0.0 0.0 0.0 60.0 $85.00 100.00 $13976.55 <br /> Ana ze Model Results 4.0 8.0 4.0 0.0 00 0.0 0.0 40.0 0.0 0.0 34.0 900 $53.17 $4 785.04 $13 113.40 <br /> Total This Task 4.0 8.0 64.0 48.0 12.0 44.0 0.0 140.0 36.0 0.01 48.0 404.0 $47.22 $19,076.72 $52,279.75 <br /> Traffic m s <br /> Describe Regional ContexIfFre' M Movement 0.0 0.0 0.0 0.0 80.0 0.0 0.0 00 0.0 0.0 4.0 84.0 $51.66 $4 339.36 $11,892.02 <br /> Summarize Exbtl Conditions 40 4.0 0.0 0.0 0.0 180 0.0 24.0 0.0 0.0 32.0 82.0 $47.97 $3 933 36 $10779.37 <br /> umma ze uture ear Conditions 4.6 4. 18. 4. .0 2. 97 933. .3 <br /> Level ry e Analysis 0 .0 2 197.70 <br /> Traffic Int ads Related to Freight/Econ Develop 4.0 4.0 4.0 0.0 0.0 0.0 0.0 12.0 0.0 0.0 24.0 48.0 $57.10 $2,740.96 $7,511.60 <br /> Total is TasR 12. 4.0 66.0 0.0 80.0 0. 1 1 7160.06 <br /> Document Needed mantelm s(04000) <br /> Ids gen nce alements 8.0 LO 2mO 0.0 00 4. 4. 4. $10,365.45 <br /> Evaluate Conceptual improvements 6.0 8.0 2.0 0.0 0.0 4.0 0.0 24.0 0.0 0.0 24 0 68.0 $53.501 $3,638.32 $9,970.8 <br /> Identify Priority Needs/Pro'eds 6.0 4.0 0.0 0.0 0.0 8.0 0.0 20.0 0.0 0.0 400 78.0 $51.601 $4024.96 $11030.40 <br /> AWitionai Model Runs 00 0.0 8.0 4.0 0.0 0.0 0.0 12.0 0.0 0.0 8.0 320 $54.93 $1,757.68 $4,816.92 <br /> Additional Level of Service Analysis 00 0.0 0.0 00 0.0 00 0.0 8.0 0.0 0.0 6.0 14.0 $48.46 $678.48 $1,85937 <br /> Pre re mosaic bele sheets from aerials 0.0 0.0 0.0 0.0 0.0 00 8.0 0.0 0.0 0.0 0.0 8.0 $34.48 $275.84 $75594 <br /> Add lines to base sheets 00 0.0 0.0 0.0 0.0 0.0 20.0 0.0 0.0 0.0 0.0 20.0 $34.48 $689.60 $1,88985 <br /> Add utility information to base sheets 0.0 0.0 0.0 0.0 0.0 0.0 26.0 0.0 0.0 0.0 00 26.0 $34.48 $896.48 $2,456.80 <br /> Total This Tas 20.0 12.0 4. 0.0 54 0 88. 0. 102.0 16. 3.68 3,145. <br /> Prepare raft In e <br /> Prepare and submit draft report 8.0 8.0 0.0 0.0 0.0 8.0 0.0 4.0 0.0 12.0 50.0 90.0 $51.15 $4603.12 $12,614.8 <br /> Review and incorporate comments/edits 4.0 4.0 00 0.0 0.0 4.0 0.0 2.0 0.0 0.0 15.0 29.0 $55.07 $1,597.16 $4,377.0 <br /> Mind and submit final report 8.0 8.0 00 0.0 0.0 8.0 0.0 4.0 0.0 12.0 15.0 55.0 $48.79 $2 683.72 $735473 <br /> GIS/Gra ics 0.0 0.0 0.0 120.0 0.0 0.0 0.0 ---17-0 1. 80 104 .1 <br /> Total This Task 20.0 20.0 00 0.0 0.0 140.0 0.0 10.0 0.0 24.0 80.0 2940 $43.13 $12,680.80 $34,751.73 <br /> Totals 104.0 148.0 52.0 9-2.3=74 0 54.0 31 . .0 24.0 3 1 M1 4 74 746.00 41.41 <br /> Rate $72.00 $68.16 $85.00 $28.70 $51.50 $31.64 $34.48 $43.68 $18.56 $26.00 $54.84 <br /> Raw,labor Cost $7,48800 $10.087.68 $680000 $1 492 40 $4 738.00 $8 669.36 $1 861.92 $1389024 $668.16 $624.00 $18,426.24 $74 746.00 $204841.4 t <br /> eat puty v I n vg aw <br /> Manager PM-CIP Endneer Modeler Engineer I Eng.I E .2 1 Eng.3 PM-TP Totals Rate Labor Labor <br /> MIP Tasks&Manhours-1-12-15 A-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.