Laserfiche WebLink
Illinois Department of Transportation <br /> Division of Highways/Region 4/District 7 <br /> 400 West Wabash/Effingham, Illinois/62401-2699 <br /> Telephone 217/342-3951 <br /> November 21, 2014 <br /> Mr. Matt Newell <br /> City Engineer <br /> #1 Gary K. Anderson Plaza <br /> Decatur, Illinois 62523 <br /> Dear Mr. Newell: <br /> Attached is a revised Exhibit A to the Intergovernmental Agreement for Local <br /> Agency Maintenance of Traffic Control Devices between the State of Illinois <br /> and the City of Decatur. The exhibit has been revised to include the <br /> installation of the signals at ILL. Route 48 and Boyd Road. <br /> Upon acceptance by the State of Illinois of the traffic signals, the division for <br /> the maintenance and energy responsibility shall be as follows: <br /> Maintenance Energy <br /> State Share 50% 50% <br /> City Share 50% 50% <br /> It is understood the maintenance shall be performed by the City either with <br /> its own force or through an ongoing contractual agreement, and that the <br /> electrical energy supplied by the services to power the signal may be <br /> reimbursed under the revisions of the Intergovernmental Agreement for <br /> Local Agency Maintenance of Traffic Control Devices at the percentages <br /> shown above and listed on the Exhibit A attached hereto. <br /> A copy of this letter is attached. If you are in agreement with the terms in <br /> this letter, please sign both copies of this letter, and return the copy to us. <br /> The original is for your file. <br /> Thank you for your cooperation in this matter. Should you have any <br /> questions or comments, please contact Josh Porter at (217)342-3951. <br /> Very truly yours, <br /> Roger L. Driskell, P.E. <br /> Deputy Director of Highways <br /> Region Four Engineer <br /> v <br /> Christopher P. Smith, P.E. <br /> Interim Operations Engineer <br /> J P/ks <br /> Enclosure <br />