Laserfiche WebLink
PART I <br /> BUDGET <br /> Cost Category Description Cost Cat DCEO Budget Variance% Variance Limit <br /> Amount <br /> DESIGN/ENGINEERING 1205 250,000.00 10.00 0.00 <br /> Total 1 $250,000.00 <br /> BUDGET LINE ITEM DEFINITIONS <br /> The definitions listed below will help to identify allowable costs for each of the budgeted lines in this Agreement. <br /> Any costs not specifically named below should be verified to be allowable by the DCEO grant manager prior to <br /> incurring the cost. <br /> DESIGN/ENGINEERING Costs associated with creation of the project's architectural drawings; <br /> engineering studies and/or fees;etc.,including costs of plans&specs <br /> and/or printing costs if specifically identified as such within the Part II <br /> Scope of Work. <br /> Pass-Through Entity or Subgrantor Responsibllities. If Grantee provides any portion of this funding to another <br /> entity through a grant agreement or contract, Grantee is considered to be a pass-through entity or subgrantor. Per <br /> Section 5.10(M) of the Agreement, Grantee must obtain written approval before it provides any portion of this <br /> funding to another entity through a grant agreement or contract. If the Department provides written approval, the <br /> Grantee must adhere to the following for any awards or contracts entered into using the Grant Funds listed above: <br /> (1) Ensure that all subgrant or contractual awards of Grant Funds are made in conformance with the terms of <br /> this Agreement specifically including,but not limited to,Sections 3.4 and 3.6 of this Agreement;and <br /> (2) Ensure subgrantees are aware of the terms and conditions of this grant and abide by them. <br /> Page 5 Grant Number 15-203002 <br />