s <br /> COUNCIL INFORMATION MEMORANDUM <br /> NO. 2014-33 <br /> DATE: August 7,2014 <br /> TO: Honorable Mayor McElroy and City Council Members <br /> FROM: Ryan P.McCrady, City Manager <br /> Richard G. Marley, P.E., Public Works Director <br /> SUBJECT: Grand Avenue Closure for City Project 2014-08 <br /> Decision to Close Grand Avenue to Traffic during Construction. <br /> Grand Avenue between Clinton Street and Illinois Street was closed on July 18, 2014 to begin <br /> extensive work to rehabilitate the street pavement by milling off the old asphalt surface, <br /> constructing base repair patches in the underlying concrete pavement and resurfacing the street. <br /> The decision to close the street was made early in the design process because of safety problems <br /> that occurred during an earlier reconstruction project at the same location. Closing the road to <br /> traffic is clearly safer than attempting to maintain 2-way traffic. <br /> In 2006, the same section of Grand Avenue was repaved while keeping the road open to 2-way <br /> traffic. Narrow traffic control barricades were used to protect the adjacent excavation and <br /> construction work.The road through the underpass is 44 feet wide which resulted in two traffic <br /> lanes only 10' wide and virtually no clearance between traffic flow and the adjacent barricades. <br /> The normal traffic volume on Grand is about 10,000 vehicles per day. (Some of the normal <br /> traffic undoubtedly detoured rather than use the narrow lanes.) As a result traffic devices were <br /> constantly being hit and vehicles damaged the exposed concrete base pavement. This is <br /> dangerous both to the travelling public and to workers. <br /> Keeping the road open to traffic by other means, such as using temporary traffic signals to <br /> alternate the flow of traffic was not considered. Based on cost experience gained using <br /> temporary traffic signals during the reconstruction of L&A Industrial Drive in 2013, it is <br /> estimated that a temporary traffic signal system would have cost an additional$12,000 on Grand <br /> with the possible closure of side streets. Temporary traffic signals have a long cycle length <br /> which tends to create long lines of traffic waiting to pass through the construction zone. This is <br /> not a problem where there is enough length of approach pavement to store vehicles waiting for <br /> the green signal. However,on Grand Avenue,the storage length between Illinois Street and <br /> Jasper Street is short. The backed up traffic would have created congestion issues at Jasper <br /> Street. <br /> As a result of this evaluation, City engineering staff determined it best to close Grand Avenue <br /> between Clinton and Calhoun during construction. The block between Calhoun Street and <br /> Illinois Street was to be closed periodically so that manhole and valve vault lids could be <br /> adjusted. Utilities are scattered throughout the road and are too high to allow traffic to return. In <br /> addition, the brick pavement is still exposed and curbing needs to be poured. It can't be opened <br /> until the hot mix asphalt surface is placed. <br /> Page I 1 <br />