Laserfiche WebLink
Future Construction Schedules <br /> If desired on future projects when road closures are considered, engineering staff could include <br /> bid specifications for more aggressive schedules and shorter closure time. Alternately, bidding <br /> specifications could require the use of temporary alternating traffic signals where appropriate. <br /> Either of these options would likely result in higher construction cost. <br /> This is for your information. <br /> Attachment: Site map. <br /> Page 13 <br />