My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-86 AUTHORIZING EXECUTION OF WATER DISTRIBUTION SYSTEM LEAK DETECTION SURVEY
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-86 AUTHORIZING EXECUTION OF WATER DISTRIBUTION SYSTEM LEAK DETECTION SURVEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2015 4:27:29 PM
Creation date
7/24/2015 4:27:27 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-86
Res Ord Title
AUTHORIZING THE EXECUTION OF A WATER DISTRIBUTION SYSTEM LEAK DETECTION SURVEY PROFESSIONAL SERVICES AGREEMENT WITH ADS LLC
Department
Water
Approved Date
8/4/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reporting <br /> We will meet with the designated City representative on daily basis and deliver any leak reports from <br /> the previous day's work. <br /> Leak sheets will be prepared with a sketch of the location, leak classification and estimated water loss. <br /> We will also prepare a progression map with symbols that indicate leaks and classification <br /> corresponding to the leak report. ADS will prepare and submit a consultant's weekly report to City's <br /> designated representative that will include: <br /> • Miles or Feet surveyed that week <br /> • Miles or Feet surveyed to date <br /> • Total estimated water loss <br /> • Number of leaks and suspected locations <br /> • Hours worked that week <br /> Final Report <br /> Our final report will summarize the project and show the results of all tests and investigations.Three <br /> hard copies of this report will be included and will include: <br /> • A description of the area surveyed <br /> • An overview of the methodology and equipment used for the survey <br /> • A comprehensive list of all leak types and locations and estimated quantity of leakage found <br /> • An inventory of defective system components and map errors encountered during the survey <br /> • Sketches of the individual leak locations <br /> • Estimated benefits-to-costs resulting from completing the leak survey effort taking into account: <br /> Estimated water loss from the leaks discovered during the survey <br /> City's production/purchase price for water <br /> Cost of the survey itself <br /> Schedule of Work <br /> ADS will be available to start the survey within three weeks of having a signed agreement. Based on the <br /> number of miles, and for each year of this project, it is estimated that the field portion of the project will <br /> take 35 working days to complete.The technician can usually cover approximately five (5)to seven (7) <br /> miles of pipe per day during the sounding phase, depending on weather and traffic conditions.The time <br /> needed to pinpoint leaks depends upon the number of leaks discovered and their level of difficulty. As <br /> previously discussed,we have found that two days of sounding the system should be followed by one <br /> day of resounding and correlating at each potential leak location.The leak survey will be conducted <br /> primarily during normal working hours with additional leak detection being conducted during late <br /> evening and/or early morning hours if necessary in areas of high traffic volume.The final report will be <br /> submitted within 30 days of the end of the field work. <br /> ofiXVHK7W0ffAL <br /> 1880 W.Fullerton Ave. Chicago, IL 60614 Page 6 <br /> Client Initials <br />
The URL can be used to link to this page
Your browser does not support the video tag.