My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-78 ACCEPTING THE BID & AUTHORIZING CONTRACT FOR NORTH STREET SIDEWALK VAULT
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-78 ACCEPTING THE BID & AUTHORIZING CONTRACT FOR NORTH STREET SIDEWALK VAULT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:07 AM
Creation date
7/28/2015 11:43:00 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-78
Res Ord Title
AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR NORTH STREET SIDWALK VAULT
Department
Public Works
Approved Date
7/7/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North Street Sidewalk Vault <br /> City Project 2014-33 <br /> June 18, 2014 <br /> ' ADDENDUM NO. 1 <br /> TO PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR: <br /> ' NORTH STREET SIDEWALK VAULT <br /> CITY PROJECT 2014-33 <br /> DATED JUNE 18,2014 <br /> ' AD-1-1 NOTICE <br /> 1.01 This Addendum No. 1, dated June 18,2014,to the Plans, Specifications <br /> and Contract Documents for the above captioned project, supersedes all <br /> contrary and conflicting information of the above mentioned bid proposal <br /> documents, which are hereby supplemented in certain particulars as <br /> ' follows <br /> AD-2-1 BID PROPOSAL <br /> ' 2.01 The pay item for Fence Removal has been added to the Bid Proposal as <br /> follows: <br /> X7010216 TRAFFIC CONTROL AND PROTECTIOI\ L SUM 1 <br /> (SPECIAL) <br /> ' Z0022800 FENCE REMOVAL FOOT 86 <br /> XXXXX100 VAULT CONSTRUCTION EACH 1 <br /> AD-3-1 PROJECT PLANS <br /> ' 3.01 Fence Removal has been added to the Summary of Quantities. <br /> 3.02 Fence Removal has been added to the Removal Plan. <br /> ' AD-4-1 SPECIAL PROVISIONS <br /> 4.01 Traffic Control and Protection, (Special) has changed as follows: <br /> It is the intent of the City that all streets under this project shall be kept open to traffic at all <br /> times unless permission is obtained from the Engineer to close said lane and/or street. The <br /> ' adiacent parkins; lane to the vault may be closed and barricaded by the contractor for the <br /> duration of construction. In the event that it is necessary to close the lane and/or street, the <br /> Engineer shall be consulted to obtain permission at least 48 working hours in advance of <br /> ' the proposed lane and/or street closing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.