' 4.02 The first paragraph of Vault Construction has changed as follows: <br /> ' This work shall consist of the filling of the existing vault space at 127 W. North Street <br /> (Huston Patterson). Work will include removal of the existing sidewalk slab and steel <br /> beams, removal of existing window fie, frame, and any items required to remove the <br /> ' window and frame, breaking up the existing floor in the area to be filled, construction of a <br /> new CMU wall, installation of waterproofing membranes, compacted CA-7 fill, <br /> construction of a brick and CMU wall to replace the existing observatory window, and all <br /> ' other work necessary for filling of the vault space as shown in the plans. <br /> 4.03 The second paragraph of Vault Construction has changed as follows: <br /> The sidewalk and beams shall be sawcut and removed,the CMU wall built, and the vault <br /> filled. All debris must be removed from the vault prior to filling. The contractor must <br /> protect any utility lines that are to remain in the vault during the removal and construction. <br /> ' 4.04 The following has been added after the 10`"paragraph: <br /> ' A freight elevator can be made available if necessary, but the contractor is encouraged to <br /> use the vault opening to transport any material into the basement or vault. <br /> ' 4.05 Planter Removal has changed as follows: <br /> The Contractor shall remove and dispose of existing planter areas as shown on the project <br /> ' drawings. The planter demolition shall include all items within the planter area(concrete, <br /> brick, electrical, sprinklers,trees with diameter less than 6", shrubs, stumps, earth, etc.). <br /> All material removed shall be disposed of in accordance with Article 202.03. The drain for <br /> ' the plantar box shall be capped off below the elevation of the bottom of the sidewalk. <br /> 4.06 Fence Removal has been added to the Special Provisions as follows: <br /> ' SP-15 FENCE REMOVAL <br /> ' DescrinNon: <br /> The Contractor shall remove the chain fence around the vault area that is attached to the <br /> existing sidewalk and pavement. The contractor will be responsible for the removal and <br /> disposal of the fence. <br /> Basis of Payment: <br /> ' This work will not be paid for separately,but shall all be considered as include in the <br /> contract unit price foot for FENCE REMOVAL. <br /> ' 4.07 SP-15 Fence Removal has been added to the Special Provisions and <br /> Standard Specifications Index as follows: <br /> ' SP-14 Pavement Removal......................................................................47 <br /> SP-15 Fence Removal...........................................................................48 <br /> IDOTStandards.......................................................................................... <br />