My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-78 ACCEPTING THE BID & AUTHORIZING CONTRACT FOR NORTH STREET SIDEWALK VAULT
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-78 ACCEPTING THE BID & AUTHORIZING CONTRACT FOR NORTH STREET SIDEWALK VAULT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:07 AM
Creation date
7/28/2015 11:43:00 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-78
Res Ord Title
AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR NORTH STREET SIDWALK VAULT
Department
Public Works
Approved Date
7/7/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br /> GC-1 CERTIFICATE OF INSURANCE (Continued) <br /> Notice: <br /> It shall be an affirmative obligation upon the contractor to advise the City's <br /> Representative at Fax No. (217) 424-2799 or mail to CITY ENGINEER, 1 GARY K. <br /> ANDERSON PLAZA, DECATUR, IL 62523, within two days of the cancellation or <br /> substantive change of any insurance policy set out above, and failure to do so shall be <br /> construed to be a breach of the contract. <br /> NOTICE: THIS CONTRACT WILL NOT BE AWARDED UNTIL THE <br /> CONTRACTOR HAS PROVIDED THE CITY WITH A CONTRACT PERFORMANCE <br /> BOND AND PROOF OF INSURANCE. <br /> GC-2 CLEANUP <br /> The Contractor shall at all times keep the premises free from accumulations of surplus <br /> excavated material, waste material or rubbish caused by their employees or work. <br /> Upon completion of the work, the Contractor shall remove all their rubbish from and <br /> about the structures, buildings, and premises, also all their tools, equipment, scaffolding and <br /> surplus materials, and shall leave their work clean, ready for use. In case of dispute, the Owner <br /> may remove the rubbish and surplus materials and charge cost of removals to the Contractor or <br /> separate contractors, if any, in proportion to amounts determined by the Engineer to be just. <br /> GC-3 CONSTRUCTION STAKING <br /> The Engineer shall provide basic line and grade staking for construction. Such basic line <br /> and grade shall be limited in general to: <br /> (1) one bench mark for a building, a plant site or a major structure <br /> Any additional (detailed) construction staking shall be provided by the Contractor, who <br /> shall be fully responsible for transfer of data from the basic lines and grades provided by the <br /> Engineer. Detailed construction staking shall generally include such items as slope stakes, <br /> intermediate centerline stakes, additional offset grade stakes and similar work. The Contractor <br /> shall also be responsible for setting of all offsets, lines, string lines, reference points, reference <br /> grades, and similar control data required to execute the work under this contract. <br /> The Contractor shall furnish all marking paint, stakes, hubs, lath or similar materials <br /> necessary for additional (detailed) construction staking, and shall provide manual assistance <br /> (rodmen) to assist the Engineer in checking or confirming the detailed staking, to whatever <br /> extent the Engineer deems necessary. Such checking, or the absence of it, by the Engineer shall <br /> in no way relieve the Contractor from full responsibility for the accuracy and adequacy of the <br /> detailed construction staking. <br /> All costs of materials and labor occasioned by the Contractor's responsibilities as listed <br /> above, shall be borne by the Contractor and shall be included in the respective bid prices of the <br /> various items work. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.