My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-78 ACCEPTING THE BID & AUTHORIZING CONTRACT FOR NORTH STREET SIDEWALK VAULT
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-78 ACCEPTING THE BID & AUTHORIZING CONTRACT FOR NORTH STREET SIDEWALK VAULT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:07 AM
Creation date
7/28/2015 11:43:00 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-78
Res Ord Title
AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR NORTH STREET SIDWALK VAULT
Department
Public Works
Approved Date
7/7/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br /> GC-4 CONTRACT WARRANTY <br /> The Contractor shalluar <br /> g antee all materials and equipment furnished and work <br /> performed for a period of one (1) year from the date of substantial completion. The Contractor <br /> warrants and guarantees for a period of one (1) year from the date of substantial completion of <br /> the system that the completed system is free from all defects due to faulty materials or <br /> workmanship and the Contractor shall promptly make such corrections as may be necessary by <br /> reason of such defects, including the repairs of any damage to other parts of the system resulting <br /> from such defects. The Owner will give notice of observed defects with reasonable promptness. <br /> 1 In the event that the Contractor should fail to make such repairs, adjustments or other work that <br /> may be made necessary by such defects, the Owner may do so and charge the Contractor the cost <br /> thereby incurred. The Contract Bond shall remain in full force and effect through the guarantee <br /> period. <br /> GC-5 CONTRACTOR AVAILABILITY <br /> At all times when work is being performed (by Contractor himself or subcontractor), the <br /> prime Contractor shall have on the job site someone in their direct employ who is capable of <br /> meeting with the Engineer and making decisions. If authorized by the Engineer, this condition <br /> may be satisfied by having a telephone number or someone who satisfies the above <br /> requirements. <br /> GC-6 COORDINATION <br /> Cooperation between the Contractor, City and Property Owners is imperative. The <br /> responsibility and cost to maintain access is borne by the Contractor. The costs for temporary <br /> walks and driveways if necessary are to be incidental to the related bid items unless specifically <br /> paid as a separate item. <br /> GC-7 DUST CONTROL <br /> As a part of their construction obligation, the Contractor shall make every reasonable <br /> effort to control dust throughout the construction area. Dirt, sand or other materials scattered <br /> over traveled areas shall be disposed of by sweeping, flushing or other appropriate measure. <br /> Temporary surfacing shall be continually maintained to avoid loose materials or dust pockets. <br /> GC-8 ESTIMATED QUANTITIES AND LOCATION CHANGES <br /> The quantities for this job are estimates only. These estimated quantities are used for <br /> establishing unit prices. The City reserves the right to increase, decrease, or omit any of the <br /> estimated quantities in this project. No additional compensation will be allowed for these <br /> changes. <br /> GC-9 FAIR EMPLOYMENT PRACTICES <br /> The Contractor and all subcontractors hereunder must comply with the provisions of the <br /> Illinois Human Rights Commission's Rules and Regulations for public contracts and the Equal <br /> Employment Opportunity Clause as contained in the Special Conditions of the Contract. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.