My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-70 ACCEPTING THE BID & AUTHORIZING CONTRACT FOR STREET RESTORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-70 ACCEPTING THE BID & AUTHORIZING CONTRACT FOR STREET RESTORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:05 AM
Creation date
7/28/2015 2:39:14 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-70
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR STREET RESTORATION
Department
Public Works
Approved Date
6/16/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF DECATUR <br /> SPECIAL PROVISIONS <br /> SP-12 RESTORATION AND SEEDING <br /> Description: Existing grass areas disturbed by construction or removal of the various <br /> work items under this contract shall be restored by properly filling and grading all disturbed areas <br /> with soil that is properly prepared for seed application and then seeding and mulching the area in <br /> accordance with Sections 250 and 251 of the Standard Specifications for Class 1 Seeding and <br /> Method 1 or Method 3 Mulching as directed by the Engineer. Fertilizer will not be required. <br /> Basis of Payment: Cost of the work will not be paid for separately but shall be <br /> considered as included with the various work items involved. <br /> ' SP-13 SEDIMENT CONTROL AND INLET PROTECTION <br /> Description: Care should be used to help minimize any sediment or other fine materials <br /> leaving the job site. Any open inlet or catch basin shall be protected from sediment infiltration <br /> using the standards outlined in the Illinois Urban Manual for INLET PROTECTION or by using <br /> an equivalent approved by the engineer. <br /> Basis of Payment: Cost of the work will not be paid for separately but shall be <br /> considered as included with the various work items involved. <br /> SP-14 SCHEDULE OF WORK <br /> Description: The General Contractor and All Sub-Contractors shall furnish in writing,g, or <br /> electronic form, a weekly schedule by 12:00 P.M., Thursday, prior to the week being scheduled, <br /> so all media, safety services and other City of Decatur Divisions can be notified. All work shall be <br /> approved by the Engineer. <br /> Basis of Payment: Cost of the work will not be paid for separately but shall be <br /> considered as included with the various work items involved. <br /> SP-15 ROAD CLOSURES <br /> ' Description: To coordinate with Millikin University's schedule, cement stabilizing work, <br /> and any other work that will require the closure of Oakland Avenue, must be performed between <br /> July 1 and July 31, 2014. The road will be closed between Sta. 100+00 and 114+00. Everything <br /> north of Sta. 114+00 will need to remain open. Use Standard BLR 21-9 for any road closures. <br /> Road Closures along Grand Avenue between Sta. 200+00 and 212+82 will be allowed as <br /> ' directed by the engineer. <br /> Basis of Payment: Cost of the work will not be paid for separately but shall be <br /> considered as included with the various work items involved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.