Laserfiche WebLink
CITY OF DECATUR ' <br /> SPECIAL PROVISIONS <br /> SP-8 CATCH BASINS TO BE ADJUSTED WITH NEW TYPE 3 FRAME AND GRATE ' <br /> Description: This work consists of removing the old catch basin structure and casting <br /> and replacing it with a new Type C catch basin with Type 3 Frame and Grate. A half-trap will <br /> need to be installed if one does not already exist. A flat slab top is to be included with this work. <br /> Basis of Payment: All labor and materials necessary to complete this work will be paid <br /> for at the contract unit price per EACH for CATCH BASINS TO BE ADJUSTED WITH NEW <br /> TYPE 3 FRAME AND GRATE. <br /> SP-9 AGGREGATE BASE COURSE, SPECIAL <br /> Description: Recycled aggregate base course CA-6 or recycled HMA shall be placed as <br /> additional material is required for soil cement work. This work shall be performed under Article <br /> 104.02 and 109.04 of IDOT specifications as directed by the engineer. Prior to placement, an <br /> IDOT Materials Inspection Approval Letter must be submitted to the engineer. <br /> Basis of Payment: All labor and materials necessary to complete this work will be paid , <br /> for at the contract unit price per TON for AGGREGATE BASE COURSE, SPECIAL. <br /> SP-10 BRICK REMOVAL <br /> Description: This work will consist of removing 4"brick after removing the asphalt <br /> surface layer. This is in preparation for the soil cement work. <br /> Basis of Payment: All labor and materials necessary to complete this work will be paid , <br /> for at the contract unit price per SQUARE YARD for BRICK REMOVAL. <br /> SP-11 CONCRETE BASE REMOVAL <br /> Description: This work will consist of removing approximately 5"thick concrete base <br /> material underneath the brick mentioned in SP-10. This is in preparation for the soil cement <br /> work. <br /> Basis of Payment: All labor and materials necessary to complete this work will be paid for <br /> at the contract unit price per SQUARE YARD for CONCRETE BASE REMOVAL. <br />