My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-70 ACCEPTING THE BID & AUTHORIZING CONTRACT FOR STREET RESTORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-70 ACCEPTING THE BID & AUTHORIZING CONTRACT FOR STREET RESTORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:05 AM
Creation date
7/28/2015 2:39:14 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-70
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR STREET RESTORATION
Department
Public Works
Approved Date
6/16/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF DECATUR <br /> SUPPLEMENTAL SPECIFICATIONS <br /> ' FOR <br /> SECTION 352: SOIL— CEMENT BASE COURSE <br /> 352.01 Description. Add the following to this Article: <br /> ' "The reconstruction work and the order in which it is conducted will be as follows: <br /> (1) Pulverizing and tilling the existing street surface and its base material to the required <br /> depth than compacting and removing excess material from the street to achieve final <br /> grade(Pay Item(s): Pulverize Shape And Compact, Earth Excavation). <br /> (2) Construction of the soil— cement base course (Pay Items: Cement, Processing Soil- <br /> Cement Base Course). <br /> (3) Cold mill the stabilized surface to level and provide the proper cross slope to the Soil- <br /> Cement base course prior to overlay(Pay Item: Shaping and Grading Roadway). <br /> ' Each street segment shall be reconstructed from initial pulverizing and tilling to final bituminous <br /> surfacing within 5 working days." <br /> 352.05 Proportioning. This Article will be deleted and the following inserted: <br /> "Proportioning Design. Prior to construction,the contractor shall, obtain samples as <br /> specified herein and prepare or have prepared soil-cement mix designs for approval by the Engineer. <br /> The existing pavement and base course will be sampled at locations designated by the Engineer for <br /> use in preparing a mix design for the soil-cement base course. At least two cores or test pits will be <br /> taken per section or block. In the event the samples show the existing pavement thickness to vary in <br /> excess of 1-inch and or the composition of the pavement material to vary substantially in the quality <br /> ' or content of aggregate and asphalt, the Engineer may direct additional samples to be collected. The <br /> samples shall be analyzed for gradation of aggregate, percent asphalt, and penetration of asphalt. <br /> Mix designs will be prepared for the soil-cement base course using the results from the <br /> analyses of the samples taken. A soil-cement mix design will be prepared recommending the <br /> application rate of cement to the used in the soil-cement base course to obtain a compressive <br /> strength of 300 pounds per square inch (psi). The design for the soil-cement base course will <br /> recommend the percent of cement to be added and the amount of aggregate base if required to fortify <br /> the base. The Marshall Stability value and the resulting maximum theoretical density shall be <br /> determined for the recommended mix design. For the purpose of assigning quantities for this <br /> project, the ratio per 100 lb. weight of cement per square yard was estimated at 10%. <br /> 352.07 Pulverizing. The first sentence of this Article is rewritten as follows: <br /> The street surface and base material shall be scarified, pulverized and mixed together to the <br /> ' depth of reconstruction prior to being shaped to the proper grade as specified in Article 352.06 and <br /> prior to application of the cement." <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.