Laserfiche WebLink
CITY OF DECATUR , <br /> SUPPLEMENTAL SPECIFICATIONS <br /> FOR ' <br /> SECTION 352: SOIL—CEMENT BASE COURSE (Continued) <br /> 352.13 Protection and Cover. RC-70 or CSS-1 H will be used to meet the bituminous material <br /> requirements of this Article. <br /> 352.15 Opening to Traffic. Article 701.17(b)(2) shall be changed to require a curing period of 36 , <br /> to 48 hours before the soil-cement base course is opened to traffic. <br /> 352.16 Maintenance. Add the following paragraphs to this Article: ' <br /> 'The Contractor may adjust valve boxes and manholes during their operations to protect <br /> them from damage. Valve boxes or manholes temporarily lowered shall be adequately protected <br /> from material or liquids entering them and from construction operations. The location of all valve <br /> boxes and manholes shall be recorded, in writing, for use in relocating them in the event of an <br /> emergency or to adjust to final grade. <br /> The Contractor shall confine their work to the limits designated by the Engineer and spillover <br /> w or cleanup caused b spillover or ' <br /> outside of this area shall be avoided. Any corrective work p y p <br /> negligence on the Contractor's part shall be corrected by the Contractor at no cost to the City. <br /> 352.18 Method of Measurement. The following subsections of this Article are rewritten or added <br /> as follows: ' <br /> Rewrite: ' <br /> (b)(3) Pulverizing and tilling the existing street surface and its base material to the <br /> required depth and then compacting prior to the removal of excess material will be <br /> measured for payment as PULVERIZE SHAPE AND COMPACT. The removal ' <br /> and disposal of excess or unsuitable material will be measured for payment as <br /> EARTH EXCAVATION. <br /> (b)(4) Replacement of unstable or unsuitable subsoil or material will be measured for <br /> payment as AGGREGATE BASE COURSE, SPECIAL in accordance with Article <br /> 351.11 of the Standard Specifications. <br /> (b)(5) VALVE BOX ADJUSTMENT and MANHOLE ADJUSTMENT will be <br /> measured each for payment. No measurement will be made of temporary <br /> adjustments. <br /> Add: ' <br /> (b)(6) Cold milling of the completed soil-cement to level the base prior to paving will be <br /> measured for payment as SHAPING AND GRADING ROADWAY. , <br /> (b)(7) The collection of field samples; the preparation of soil-cement mix designs; and <br /> quality control testing through construction of the base courses for this project will , <br /> be measured for payment as SOIL-CEMENT MIX DESIGN AND FIELD <br /> TESTING. <br />