Public Works Memorandum <br /> NO. 2014-25 <br /> DATE: June 9, 2014 <br /> TO: Honorable Mayor McElroy and City Council <br /> FROM: Ryan P. McCrady, City Manager <br /> Richard G. Marley, P.E., Public Works Director <br /> SUBJECT: Annual Street Restoration (Mill and Overlay) Project, <br /> City Project 2014-08, Section No. 14-00408-00-FP <br /> SUMMARY RECOMMENDATION: <br /> It is recommended that the City Council approve the attached resolution awarding the contract for <br /> the Annual Street Restoration(Mill and Overlay) Project, City Project 2014-08,to Tyrolt, Inc. <br /> d/b/a Dunn Company, as the lowest, responsible bidder in the amount of$1,400,000 and that the <br /> Mayor be authorized to execute the contract and the City Clerk to attest. The resolution represents <br /> an expenditure of$1,361,935.68 as the low bid plus $38,064.32 for project contingencies. <br /> PRIOR COUNCIL ACTION: <br /> May 5, 2014—Council approved Resolution R2014-33 appropriating $1,400,000 of Motor Fuel <br /> Tax funds for the purpose of resurfacing streets and highways under the applicable provisions of <br /> the Illinois Highway Code. <br /> BACKGROUND: <br /> Streets Inspected Annually <br /> The Engineering Division inspects and rates approximately 1/2 of the City's streets on a yearly <br /> basis. The results of these inspections are input into a computer database which is used to project <br /> the future condition of the streets based on their current and historical condition, and surface type <br /> (i.e. brick, concrete, asphalt, etc.). This data is then paired with available funding and is used as a <br /> basis to aid City Engineering in the preparation of the City's yearly street improvement program. <br /> Staff then determines what type of improvement would be appropriate for each street. <br /> Project Description <br /> The 2014 project will perform mill and overlay work on portions of Mound Road, Grand Avenue, <br /> and Oakland Avenue. A portion of Oakland Avenue will also be reconstructed as the material <br /> underneath the pavement has failed. Reconstruction generally involves the full removal of the <br /> pavement, stabilizing the base material with cement, and then relaying an asphalt surface. In total, <br /> 3.61 lane miles of the City's 825 total lane miles will be rehabilitated as part of this project. <br /> Page 11 <br />