BACKGROUND: <br /> William Street Streetscape and Open Space Enhancement <br /> The demolition of the Barnes Building parking garage prevented the City from performing <br /> streetscape improvements on the south side of William Street between Franklin Street and State <br /> Street with the other streetscape projects. The parking garage has now been demolished and City <br /> staff prepared a design to install streetscape improvements to match those installed throughout the <br /> downtown and those planned for installation on Franklin Street. <br /> Bidding <br /> The project plans and specifications were prepared by the Engineering Division. The project was <br /> advertised on Wednesday, March 26, 2014, and bids were opened on Wednesday, April 16, 2014. <br /> The results for the letting are as follows: <br /> ................................................................................... .............................. .............................. ... ......_......................................._........................................................................................................................ ..............................__........ <br /> ; <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over -Under <br /> .................................. ........................................�........................................................................._._.................................. �.............._._. <br /> .Christy-Foltz,.._Inc........... ..... .. ...................................................._......................................................._.......................................;........_$1,21,853.00........._'._......................(31.32%)............._...... <br /> Kinney Contractors Inc. $126,684.00 (36.53%) <br /> ................ ......._y.................................................. ......................................................................................................................................................................................t....................................._........._........._ .................................._.................... <br /> ...; <br /> Otto Baum Company, Inc................. ... ............................................_._._. _. $133 195.25 (43.54%) <br /> ...................-----.. ................. ......................_z..........................._............_,. ................................. <br /> _Engineer's Estimate $92,791.00..._.. ......................................................... <br /> Recommended Award <br /> Christy-Foltz, Inc. provided the low bid for the proposed work at 31%over the engineer's estimate. <br /> The three bids received are all within about $12,000 of each other. This indicates that the engineer's <br /> estimate for the work is too low. It is difficult for designers to foresee the added costs incurred to <br /> mobilize for the small quantity of work that the William Street project entails. Rebidding the project <br /> would likely result in a higher estimate and nearly the same contractor bids. With a project this <br /> small, it is hard to make significant changes that will reduce the cost of the work. <br /> Christy-Foltz has satisfactorily completed street and sidewalk projects for the City. Staff <br /> recommends that the City Council approve a contract with Christy-Foltz, Inc., to perform the William <br /> Streetscape Project. <br /> SCHEDULE <br /> The project is scheduled to begin in May and will be completed in July prior to the Decatur <br /> Celebration. <br /> BUDGET/TIME IMPLICATIONS: <br /> Budget Impact: Funding for this project is allocated in the Bond Fund. The recommended low bid <br /> amount is $121,853. <br /> Staffing Impact: Staff time has been allocated to manage this project. <br /> Page 12 <br />