My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-26 AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-26 AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 3:51:53 PM
Creation date
7/30/2015 3:51:49 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-26
Res Ord Title
AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC. FOR CONSTRUCTION ENGINEERING AND RESIDENT INSPECTION SERVICES FOR THE UNION STREET SEWER REHABILITATION
Department
Public Works
Approved Date
4/21/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Assist in obtaining from OWNER additional details or information, when <br /> required for proper execution of the Work. <br /> 5. Interpretation of Contract Documents: Report to ENGINEER when clarifications <br /> and interpretations of the Contract Documents are needed and transmit to <br /> Contractor clarifications and interpretations as issued by ENGINEER. <br /> 6. Shop Drawings and Samples: <br /> a. Record date of receipt of Samples and approved Shop Drawings. <br /> b. Receive Samples which are furnished at the Site by Contractor, and notify <br /> ENGINEER of availability of Samples for examination. <br /> c. Advise ENGINEER and Contractor of the commencement of any portion of the <br /> Work requiring a Shop Drawing or Sample submittal for which RPR believes <br /> that the submittal has not been approved by ENGINEER. <br /> 7. Modifications: Consider and evaluate Contractor's suggestions for modifications in <br /> Drawings or Specifications and report such suggestions, together with RPR's <br /> recommendations, to ENGINEER. Transmit to Contractor in writing decisions as <br /> issued by ENGINEER. <br /> 8. Review of Work and Rejection of Defective Work. <br /> a. Conduct on-site observations of Contractor's work in progress to assist <br /> ENGINEER in determining if the Work is in general proceeding in accordance <br /> with the Contract Documents. <br /> b. Report to ENGINEER whenever RPR believes that any part of Contractor's <br /> work in progress will not produce a completed Project that conforms generally <br /> to the Contract Documents or will imperil the integrity of the design concept of <br /> the completed Project as a functioning whole as indicated in the Contract <br /> Documents, or has been damaged, or does not meet the requirements of any <br /> inspection, test or approval required to be made; and advise ENGINEER of <br /> that part of work in progress that RPR believes should be corrected or rejected <br /> or should be uncovered for observation, or requires special testing, inspection, <br /> or approval. <br /> 9. Inspections, Tests, and System Startups: <br /> a. Consult with ENGINEER in advance of scheduled major inspections, tests, and <br /> systems startups of important phases of the Work. <br /> b. Verify that tests, equipment, and systems start-ups and operating and <br /> maintenance training are conducted in the presence of appropriate OWNER's <br /> personnel, and that Contractor maintains adequate records thereof. <br /> c. Observe, record, and report to ENGINEER appropriate details relative to the <br /> test procedures and systems start-ups. <br /> Last Revised: 10/17/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.